Tolls collected per toll class in <strong>2007</strong> In <strong>2007</strong> the number of vehicle crossings at toll stations totalled 78.6 million, which is 9 % more than in 2006. Toll class Tolls collected Tolls collected Index Share (%) in <strong>2007</strong> (EUR) in 2006 (EUR) <strong>2007</strong>/2006 (<strong>2007</strong>) R1 48,784,120 48,114,327 101 27 R2 11,108,265 9,695,580 115 6 R3 12,521,878 10,768,535 116 7 R4 65,371,388 52,538,425 124 36 ETC 41,863,441 35,862,201 117 23 TOTAL 179,649,093 156,979,069 114 100 Note: Data on tolls collected are exclusive of VAT. The data on tolls collected at toll stations per toll class differ from the revenue from tolls collected for the following reasons: • discounts specified in the pricelist (for loading credit on electronic mediums (tags), post-paid tolls, etc.), as a result of which the revenue is smaller than actually loaded/utilised (estimated acc. to passages through toll stations), and • the report on tolls collected is prepared by shift (the third night shift bears the date when the shift began), while revenue is recorded on the basis of actually issued invoices or utilised credit on electronic mediums. 23 ANNUAL REPORT <strong>DARS</strong> d.d. <strong>2007</strong> BUSINESS REPORT
Completed Construction and Reconstruction Works on Motorway Sections In <strong>2007</strong> the value of completed construction and reconstruction works on motorway sections (excluding agent compensation and liabilities from borrowings and bonds) amounted to EUR 609,510,986, which is 2 percent above the plan. New motorway sections constructed in <strong>2007</strong> reached a total value of EUR 534,183,393, which is 7 percent above the plan. Scheduled and completed construction and reconstruction works on motorway sections in <strong>2007</strong> (Amounts include financing costs for individual sections) Scheduled <strong>2007</strong> Completed <strong>2007</strong> Index Motorway section (EUR) (EUR) Completed <strong>2007</strong> / Scheduled <strong>2007</strong> MARIBOR - LENART 35,433,064 35,796,384 101 LENART - COGETINCI: Lenart - Spodnja Senarska 25,461,292 27,035,901 106 HAJDINA - ORMOŽ: Hajdina - Ptuj 2,029,943 6,612,691 326 BELTINCI - PINCE: BELTINCI — LENDAVA, Phase I 31,835,989 49,096,237 154 LENART - BELTINCI: Cogetinci - VuËja vas 19,354,298 24,178,357 125 Motorway PESNICA - SLIVNICA: Zrkovska cesta - Ptujska cesta 16,679,999 10,144,048 61 PESNICA - SLIVNICA: Zrkovska — Pesnica link road 33,790,002 37,530,375 111 BELTINCI - PINCE: LENDAVA — PINCE, Phase I 33,703,518 72,397,497 215 Motorway PESNICA - SLIVNICA: Nova Zrkovska c., km 0.87 - km 3.8 1,220,001 4,059,334 333 LENART - COGETINCI: SPODNJA SENARSKA — COGETINCI 39,827,205 42,139,313 106 Motorway SLIVNICA — DRAŽENCI 26,444,109 25,473,939 96 Draženci - Gruškovje, subsection of intern. border crossing Gruškovje — state border — additional program 4,882,741 2,505,546 51 PROJECT 1 — TOTAL 270,662,161 336,969,621 124 RAZDRTO — VIPAVA: Rebernice 38,632,259 40,310,022 104 Motorway KLANEC - ANKARAN: Connection to Port of Koper, Phase I 12,547,960 9,823,560 78 Motorway KLANEC - ANKARAN: Petrol pump platform Bertoki 209,998 526 0 Motorway KOPER — IZOLA 17,015,882 5,785,700 34 PROJECT 4 — TOTAL 68,406,099 55,919,808 82 ŠENTVID — KOSEZE 58,124,124 41,140,421 71 BI» - HRASTJE: PONIKVE - HRASTJE 9,569,550 4,655,389 49 ŠMARJE SAP - VIŠNJA GORA: Petrol pump platform Cikava 1,609,998 59,331 4 PERAËICA - PODTABOR 11,161,683 11,442,034 103 Motorway VRBA - PERAËICA 38,238,240 45,718,599 120 Motorway HRASTJE - KRONOVO: Lešnica - Kronovo 27,639,455 31,067,551 112 BI» - HRASTJE: PLUSKA - PONIKVE 13,452,799 7,210,640 54 PROJECT 6 — TOTAL 159,795,849 141,293,964 88 24 ANNUAL REPORT <strong>DARS</strong> d.d. <strong>2007</strong> BUSINESS REPORT