Owing to the exceptional increase in heavy vehicle traffic, roads began to deteriorate quickly. The need<br />
for rehabilitation works is rapidly appearing on the motorway in the Štajerska and Pomurje areas.<br />
Intensive efforts were devoted in <strong>2007</strong> to dealing with the lack of parking space for heavy freight vehicles,<br />
particularly on the motorway section in the Štajerska area. This called for the additional engagement of<br />
employees at the Motorway Maintenance Centre Slovenske Konjice.<br />
A new section of the Gorenjska leg of the motorway (Podtabor — PeraËica) in a length of 3.0 km was given<br />
over to traffic. On 31 December <strong>2007</strong>, as many as 525,398 equivalent kilometres of motorway and other<br />
roads were being managed by <strong>DARS</strong> d.d..<br />
Within the scope of implemented projects, the following tasks were completed in <strong>2007</strong>:<br />
• a work order programme for monitoring the performance of works was implemented and is being<br />
executed in all motorway maintenance centres,<br />
• a work order programme for monitoring machine equipment was executed up to a phase enabling its<br />
application in all motorway maintenance centres in 2008,<br />
• a project for the management of public utility devices was completed and provides for the systematic<br />
performance of tasks in this area during daily work,<br />
• specialised teams carried out works in <strong>2007</strong> on ground markings, cleaning of tunnels, cleaning and<br />
inspection of gutters. A team was trained to operate a crack-filling machine.<br />
Intensive efforts were devoted to the maintenance of rest areas. The Company began to redefine its<br />
relations with lessees (Petrol, OMV). A precise inventory of conditions in rest areas was conducted.<br />
The Preliminary Works Department carried out all tasks relating to the protection of roads as defined in<br />
the Roads Act (Chapter V — Protection of Public Roads and Traffic), and resolved insurance issues relating<br />
to liability and claims for damages caused by traffic participants on motorways. Other tasks performed<br />
by the Department included:<br />
• the preparation of specific offers for subcontractors or contractors of <strong>DARS</strong>,<br />
• the elaboration of pricelists of works, which was transferred to the Sales and Marketing Department<br />
during the course of the year,<br />
• the preparation of opinions regarding motorway closures.<br />
Motorway Operation<br />
In <strong>2007</strong>, two plans were adopted in connection with the operation of motorways and expressways:<br />
• a regional safety and rescue plan in case of major traffic accidents on motorways in the Posavje region<br />
(adopted by the Administration of RS for Civil Protection and Disaster Relief, Brežice branch), and<br />
• a regional safety and rescue plan in case of major traffic accidents on motorways in the Primorska<br />
region (adopted by the Administration of RS for Civil Protection and Disaster Relief, Koper branch).<br />
Together with the Regional safety and rescue plan for the Western Štajerska region adopted in 2006,<br />
three regional safety and rescue plans were in place at the end of <strong>2007</strong>. In other regions (Kranj, Maribor,<br />
Ljubljana, Murska Sobota), the Company prepared, together with competent branches, expert bases for<br />
the preparation of regional safety and rescue plans in case of major traffic accidents on motorways.<br />
In <strong>2007</strong> all works on motorways and expressways and all maintenance works were carried out under road<br />
closures, which are regulated by the Rules on the marking and protection of works on public roads and<br />
obstacles in road traffic (Official Gazette of RS, no. 116/2006). Throughout the year, the Company issued<br />
a total of 128 road closure orders for major works (rehabilitation, oversurfacing, elimination of defects<br />
in the warranty period, and similar), while regular maintenance works and interventions are carried out<br />
under daily closures.<br />
44 ANNUAL REPORT <strong>DARS</strong> d.d. <strong>2007</strong> BUSINESS REPORT