Owing to the exceptional increase in heavy vehicle traffic, roads began to deteriorate quickly. The need<br />

for rehabilitation works is rapidly appearing on the motorway in the Štajerska and Pomurje areas.<br />

Intensive efforts were devoted in <strong>2007</strong> to dealing with the lack of parking space for heavy freight vehicles,<br />

particularly on the motorway section in the Štajerska area. This called for the additional engagement of<br />

employees at the Motorway Maintenance Centre Slovenske Konjice.<br />

A new section of the Gorenjska leg of the motorway (Podtabor — PeraËica) in a length of 3.0 km was given<br />

over to traffic. On 31 December <strong>2007</strong>, as many as 525,398 equivalent kilometres of motorway and other<br />

roads were being managed by <strong>DARS</strong> d.d..<br />

Within the scope of implemented projects, the following tasks were completed in <strong>2007</strong>:<br />

• a work order programme for monitoring the performance of works was implemented and is being<br />

executed in all motorway maintenance centres,<br />

• a work order programme for monitoring machine equipment was executed up to a phase enabling its<br />

application in all motorway maintenance centres in 2008,<br />

• a project for the management of public utility devices was completed and provides for the systematic<br />

performance of tasks in this area during daily work,<br />

• specialised teams carried out works in <strong>2007</strong> on ground markings, cleaning of tunnels, cleaning and<br />

inspection of gutters. A team was trained to operate a crack-filling machine.<br />

Intensive efforts were devoted to the maintenance of rest areas. The Company began to redefine its<br />

relations with lessees (Petrol, OMV). A precise inventory of conditions in rest areas was conducted.<br />

The Preliminary Works Department carried out all tasks relating to the protection of roads as defined in<br />

the Roads Act (Chapter V — Protection of Public Roads and Traffic), and resolved insurance issues relating<br />

to liability and claims for damages caused by traffic participants on motorways. Other tasks performed<br />

by the Department included:<br />

• the preparation of specific offers for subcontractors or contractors of <strong>DARS</strong>,<br />

• the elaboration of pricelists of works, which was transferred to the Sales and Marketing Department<br />

during the course of the year,<br />

• the preparation of opinions regarding motorway closures.<br />

Motorway Operation<br />

In <strong>2007</strong>, two plans were adopted in connection with the operation of motorways and expressways:<br />

• a regional safety and rescue plan in case of major traffic accidents on motorways in the Posavje region<br />

(adopted by the Administration of RS for Civil Protection and Disaster Relief, Brežice branch), and<br />

• a regional safety and rescue plan in case of major traffic accidents on motorways in the Primorska<br />

region (adopted by the Administration of RS for Civil Protection and Disaster Relief, Koper branch).<br />

Together with the Regional safety and rescue plan for the Western Štajerska region adopted in 2006,<br />

three regional safety and rescue plans were in place at the end of <strong>2007</strong>. In other regions (Kranj, Maribor,<br />

Ljubljana, Murska Sobota), the Company prepared, together with competent branches, expert bases for<br />

the preparation of regional safety and rescue plans in case of major traffic accidents on motorways.<br />

In <strong>2007</strong> all works on motorways and expressways and all maintenance works were carried out under road<br />

closures, which are regulated by the Rules on the marking and protection of works on public roads and<br />

obstacles in road traffic (Official Gazette of RS, no. 116/2006). Throughout the year, the Company issued<br />

a total of 128 road closure orders for major works (rehabilitation, oversurfacing, elimination of defects<br />

in the warranty period, and similar), while regular maintenance works and interventions are carried out<br />

under daily closures.<br />

44 ANNUAL REPORT <strong>DARS</strong> d.d. <strong>2007</strong> BUSINESS REPORT