27.01.2015 Views

DARS_porocilo 2007 ANG.indd

DARS_porocilo 2007 ANG.indd

DARS_porocilo 2007 ANG.indd

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TOTAL NEW MOTORWAYS 498,864,109 534,183,393 107<br />

TOTAL FINISHING WORKS ON MOTORWAYS CONSTRUCTED<br />

AFTER 1994<br />

TOTAL FINISHING WORKS ON MOTORWAYS CONSTRUCTED<br />

BEFORE 1994<br />

18,230,604 17,718,296 97<br />

9,180 262,082 2855<br />

ELABORATION OF DESIGN AND OTHER DOCUMENTS FOR MOTORWAY<br />

SECTIONS AFTER <strong>2007</strong><br />

ACQUISITIONS OF LAND AND OTHER REAL PROPERTY FOR MOTORWAY<br />

SECTIONS AFTER <strong>2007</strong><br />

5,769,066 2,801,524 49<br />

3,338,341 958,236 29<br />

DRAGONJA International border crossing 1,251,878 1,194,133 95<br />

ŠMARJE - DRAGONJA: Dragonja bypass road 834,585 0 0<br />

IG TRAINING CENTER 125,188 0 0<br />

Traffic Surveillance and Management Centre and<br />

Toll Collection Centre (Dragomelj)<br />

1,669,170 307,968 18<br />

TRAFFIC SURVEILLANCE AND MANAGEMENT SYSTEM (ITS) 6,948,385 6,336,192 91<br />

VPD COORDINATION COSTS 292,105 210,685 72<br />

QUALITY CONTROL 271,240 240,260 89<br />

AUDITS (ZGO-1) 629,999 938,355 149<br />

ENLARGEMENT OF EXISTING TOLL COLLECTION BOOTHS 0 99,177 -<br />

ELECTRONIC TOLL COLLECTION SYSTEM 7,368,386 403,344 5<br />

Abolition of international border crossings in the area of<br />

motorways and expressways<br />

0 281,472 -<br />

CONSTRUCTION OF CONNECTING ROADS 5,959,911 3,210,344 54<br />

MOTORWAY RESURFACING AND REPLACEMENT OF FIXTURES 45,370,001 40,365,525 89<br />

TOTAL (not including prepayments of agent compensation) 596,932,148 609,510,986 102<br />

AGENTS COMPENSATION 31,070,065 30,049,597 97<br />

TOTAL (not including liabilities from loans and bonds) 628,002,213 639,560,583 102<br />

LIABILTIIES FROM LOANS AND BONDS 106,175,543 112,309,444 106<br />

GRAND TOTAL 734,177,756 751,870,027 102<br />

Note:<br />

Amounts include VAT.<br />

Completed motorway construction and reconstruction works refers to completed works and liabilities from borrowings and bonds in<br />

accordance with the provisions of the Agreement on the Performance of Contracts relating to the construction and reconstruction of<br />

motorways, financial engineering, and other related tasks under the National Motorway Construction Programme.<br />

The agent compensation is lower than planned because this item also includes the final settlement of compensation for 2006 (credit<br />

note) on the basis of actual values specified in the Report on the development and rehabilitation of motorways in 2006.<br />

25 ANNUAL REPORT <strong>DARS</strong> d.d. <strong>2007</strong> BUSINESS REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!