27.01.2015 Views

DARS_porocilo 2007 ANG.indd

DARS_porocilo 2007 ANG.indd

DARS_porocilo 2007 ANG.indd

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

International Cooperation Department<br />

For the purpose of utilising funds from the Cohesion Fund, the Department cooperated in <strong>2007</strong> with<br />

competent Slovene ministries and EU institutions in implementing procedures for the utilisation of funds,<br />

and organised and conducted the implementation of required tasks by other divisions of the Company<br />

participating in the activities of the Cohesion Fund. The project involving the construction of the motorway<br />

section Smednik — Krška vas was successfully completed after obtaining approval of the final report, and<br />

activities were continued on the project for the construction of the Vrba — PeraËica motorway section.<br />

In line with the Operational Programme for the development of environmental and traffic infrastructure,<br />

procedures were carried out for the purpose of utilising European cohesion policy funds for 4 motorway<br />

projects included in the scheme of co-financing from the Cohesion Fund in the programme period <strong>2007</strong>-<br />

2013.<br />

In addition to funds from the Cohesion Fund, the Company also received funds in <strong>2007</strong> from the European<br />

Fund for Regional Development in the form of technical assistance in the preparation of certain studies<br />

for the third development axis, as well as funds from the TEN-T budget to be used for the preparation of<br />

specific project and spatial documents for the road section Slivnica — Draženci — Gruškovje.<br />

Again in <strong>2007</strong>, the Company actively participated in various international projects. Several meetings<br />

were organised in connection with the TEMPO-CONNECT projects, the EASYWAY program, and the<br />

PROMET project. The Company continued to participate in the MEDIA project for the establishment of<br />

interoperability of toll collection systems in the alpine region, and in the RANKERS traffic safety project.<br />

New project proposals and relevant documents needed for their co-financing from European funds were<br />

prepared.<br />

Within the scope of its membership in ASECAP, the Company participated in the Steering Committee,<br />

General Assembly, Executive Committee, working bodies and projects of this association in 2006.<br />

General Affairs Department<br />

The processing of incoming mail was centralised and, in the autumn period, a comprehensive electronic<br />

office mail system using the line code was implemented. The central organisation and management of<br />

the courier service was introduced, and courier routes were rationalised. For the purpose of ensuring<br />

the adequate arrangement of available archival areas, the Department prepared internal regulations<br />

comprised of internal acts related to the archiving of documentary materials within the scope of the<br />

Company’s archives.<br />

Occupational Health and Safety Department<br />

The Occupational Health and Safety Department carried out the following tasks:<br />

• in the area of health protection: organised medical examinations, vaccinations against tick-borne<br />

meningoencephalitis and influenza, and participated in the completion of documents for disability<br />

committees,<br />

• in the area of education: organised general internal training programmes in the fields of occupational<br />

health and safety, fire protection, and the operation of complex working machines, tools and<br />

equipment;<br />

• in the area of fire protection: organised inspections and repairs of fire extinguishers and hydrants;<br />

• in the area of working environment: carried out measurements of chemical hazards in the painting of<br />

ground markings;<br />

• performed activities at construction and reconstruction sites,<br />

• reviewed risk assessments in other areas. A number of new measures for improving the health and<br />

safety of employees were included in the risk assessments.<br />

32 ANNUAL REPORT <strong>DARS</strong> d.d. <strong>2007</strong> BUSINESS REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!