27.01.2015 Views

2010 Kenworth T440/T470 Body Builder Manual

2010 Kenworth T440/T470 Body Builder Manual

2010 Kenworth T440/T470 Body Builder Manual

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 4<br />

Exhaust & Aftertreatment<br />

FIGURE 4-3: Orientation of Dosing Module<br />

Right Hand Under DPF and SCR with Small, Medium, or Large DEF Tanks<br />

FIGURE 4-4: RH Under Cab Exhaust with Small, Medium, or Large Tanks.<br />

The height differential between the supply module and dosing module can not exceed one meter. The supply module is<br />

integrated into the DEF tank assembly, separation of the module from the tank is not allowed.<br />

When relocating the components the maximum pressure DEF hose length, from Supply module to Dosing Module, is 3<br />

meters (118”).<br />

DEF Pressure hose must include a “trap” in the routing if Dosing Module is below the highest point of the Supply Module<br />

(See Figure 4-9 on page 4-9).<br />

4-5<br />

12/09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!