Installation (cont.)<br />

Corrective Actions<br />

Use the correct tools and procedures to apply uniform pressure to<br />

press fit the <strong>seal</strong> in the housing.<br />

To install a large diameter<br />

<strong>seal</strong>, tap around the <strong>seal</strong> in the<br />

sequence shown above (fig. 8h).<br />

HS8<br />

Connect the split <strong>seal</strong>’s spring after<br />

the <strong>seal</strong> is placed around the shaft<br />

(fig. 8i).<br />

Large Diameter Seal Installation<br />

Installation of a large diameter <strong>seal</strong> follows the same procedures<br />

as those used in standard <strong>seal</strong> installation. Follow these steps:<br />

• Check the bore, shaft, shaft ends, splines and keyways, for<br />

imperfections, dirt and anything that shouldn’t be there.<br />

• Check dimensions. Be sure the correct <strong>seal</strong> size has been selected.<br />

• Check for parts interference. Watch out for metal-to-metal contact<br />

between the <strong>seal</strong> shell and shaft surface.<br />

• Check the <strong>seal</strong>. Is it the right style for the application?<br />

• Check <strong>seal</strong> direction. The <strong>seal</strong> lip should be pointed toward<br />

the lube for retention, or away from the lube for dirt exclusion.<br />

• Pre-lube the <strong>seal</strong>ing element. Always use the same lubricant<br />

as the one used in the application.<br />

• Position the <strong>seal</strong> properly. Be sure it sits squarely in the bore.<br />

During installation, never hammer directly on the <strong>seal</strong>. Because<br />

of their size, it is often not possible to apply uniform pressure across<br />

the <strong>seal</strong> at one time.<br />

For flush installation:<br />

Use a board or wooden block to progressively tap the <strong>seal</strong> into the<br />

bore. A little at a time, gradually ease the <strong>seal</strong> into the bore. Gently tap<br />

at 9 o’clock, 3 o’clock, 12 o’clock and 6 o’clock positions to avoid cocking<br />

the <strong>seal</strong> (fig. 8h).<br />

Large Diameter Split Seal Installation<br />

A large diameter split <strong>seal</strong> is correctly installed by following these steps:<br />

• Lightly lubricate the <strong>seal</strong>’s O.D. and inner lip.<br />

• Apply the <strong>seal</strong> around the shaft, positioning it at the desired<br />

location with the butt ends of the <strong>seal</strong> at the 12 o’clock position.<br />

• Make the spring connection (see following section for details) (fig. 8i).<br />

• Tap the <strong>seal</strong> in place, alternately striking lightly around<br />

its circumference.<br />

• Install the cover plate.<br />

72