State of Hawaii Page 30<br />
Figure 7. Requests transmitted to facility operators by the Hawaii One Call Center<br />
60000<br />
56065<br />
50000<br />
Number of Requests<br />
40000<br />
30000<br />
20000<br />
33320<br />
39151 38358<br />
40825 40059<br />
10000<br />
0<br />
FY07 FY08 FY09 FY10 FY11 FY<strong>12</strong><br />
Fiscal <strong>Year</strong><br />
There are cases in which immediate action in locating a subsurface installation is<br />
necessary to prevent or mitigate loss of or damage to life, health, property or essential<br />
public services. These emergency cases are called emergency locates and Hawaii One<br />
Call Center notification is done after the emergency work is completed, as opposed to<br />
the locates, or ticket requests, that are done before excavation, mentioned above. After<br />
the One Call Center receives notice of an emergency locate, they notify facility<br />
operators of the action.