Sanderson Gulch Major <strong>Drainage</strong>way Plan<br />

<strong>Baseline</strong> <strong>Hydrology</strong> <strong>Report</strong><br />

Draft <strong>Baseline</strong> <strong>Hydrology</strong> Review Comments dated <strong>October</strong> 9, <strong>2012</strong> and Responses<br />

Sanderson Gulch Major <strong>Drainage</strong>way Plan<br />

Ocotber <strong>2012</strong><br />

Section Author Page No. Comment Response<br />

Section 3.3.1 Lakewood 23 Delete last sentence in 4th paragraph Done<br />

Section 3.3.5 UDFCD 24<br />

Revise text in 1st paragraph ‐ Add statement that says the decision was made to include these ponds since they were included in the previous study. Also, add "(private)" after the<br />

private ones.<br />

Done<br />

Section 3.3.5 Lakewood 24 Clairefield Reservoir no longer exists ‐<br />

Section 3.3.5 Denver 24 Add Miss. Gulch Reservoirs (Garfield and Huston Lake) Done<br />

Section 3.3.5 Denver 24 Add text related to required agreements with owners for future use Done<br />

Section 3.3.6 Denver 25 Address Mike's comment regarding trans‐basin flow and the drain in Lowell Done<br />

Section 3.3.6 Denver 25 Add "Sanderson Gulch" before "watershed" Done<br />

Section 3.3.6 Denver 25 Revise 3rd paragraph to address mikes comments Done<br />

Section 3.3.6 Denver 25 Add Section 3.7 for Mississippi Gulch Done<br />

Section 3.3.6 Lakewood 25 Change "the interactive hydrology map of Figure B‐1" to "figure B‐4, Hydrologic Routing Schematic" ‐<br />

Section 3.4 Lakewood 26 In 2nd paragraph, change "Figure B‐6" to "B‐5" and "B‐7" to "B‐6" Done<br />

Section 3.5 Lakewood 27 Change "Table 3‐7" to "3‐6" Done<br />

Section 3.5 Lakewood 27 Check for missing Figure B‐8 Done<br />

Table 3‐6 UDFCD 27<br />

Need to add to this table columns for the duplicate effective model you created, so we can see that the numbers matched the 1972 study. Why not just replace this table with Table<br />

B‐1?<br />

Done<br />

Table 3‐6 UDFCD 27 Some of these numbers don't match what's shown in Table B‐1. Done<br />

Table 3‐6 UDFCD 27 Why are peak flow differences so high, especially at GG Road Detention? Incorporate Green Gables Redevelopment CLOMR<br />

Section 3.6 Denver 28 Add section 3.X for 100‐Year Storm, Mississippi Gulch and address Mike's comments Done<br />

Section 3.6 Denver 28 Add text describing conclusion of statistical gage analysis Done<br />

Section 9 Denver 29 Add "Greenway Foundation, River South Master Plan (2009)" Done<br />

Section 9 Denver 29 Add "<strong>Final</strong> Draft" before "Mississippi" Done<br />

Appendix B Denver Fig B‐1<br />

Add note to soils map: "Type C is used since data is not available from the U.S. Department of Agriculture‐Natural Resources Conservation Service (NRCS); formerly the Soils<br />

Conservation Service."<br />

Label added<br />

Appendix B Lakewood Fig B‐2 Add "100‐Year" to legend Done<br />

Appendix B Matrix Fig B‐2 On fig B‐2, page 44‐45 change "Table" to "Figure" in title Done<br />

Appendix B Denver Fig B‐5 Clairfield misspelled Done<br />

Appendix B Denver Fig B‐5 Add "Pond" after "Jewell Park" Done<br />

Appendix B Denver Fig B‐7 Update Miss. Gulch flows, if needed based on Mike's comments on pages 31 & 34 Done<br />

Appendix B Lakewood Table B‐1 Confirm with or without detention Done<br />

Appendix B Lakewood Table B‐1 Why are the S Lowell Blvd numbers crossed out? Done<br />

Appendix B Denver Table B‐1 Explain footnote #2 and/or reference section Done<br />

Appendix B Denver Table B‐3 "Curve" misspelled Done<br />

Appendix B Denver Table B‐4 Change Denver 1‐hour, 5‐year to 1.34 Done<br />

Appendix B Denver Table B‐4 Denver Manual does not have a value for 25‐year, 1‐hour Done<br />

Appendix B Denver Table B‐4 Add "Table 5.1 of the " before Denver Done<br />

Appendix B Denver Table B‐4 Add "Manual" after "Criteria" Done<br />

Appendix B Denver Table B‐4 "Revised" is misspelled Done<br />

Appendix B Denver Table B‐4 Use "UDFCD Storm <strong>Drainage</strong> Criteria Manual" instead of "USDCM" Done<br />

Appendix B Denver Table B‐4 Denver Manual does not have 2‐hour total rainfall Done<br />

Appendix B UDFCD Table B‐6 Confirm second depth value for Smith Res. (0.3 instead of 1?) Done<br />

Appendix B UDFCD Table B‐6 Clairfield misspelled Done<br />

Appendix B UDFCD Table B‐6 Check 10‐ft Discharge for Clairfield Res. (2684?) Done<br />

Appendix B Denver Fig E‐1 Show pipe symbol connecting Smith and Kendrick Reservoirs Pipe added<br />

Appendix B Denver Fig E‐1 Add "Remnant" to Miss Gulch label Label changed<br />

Appendix B Denver Fig E‐1 Add label for W. Florida Ave. Label added<br />

Appendix B Denver Fig E‐2 Show pipe symbol connecting Smith and Kendrick Reservoirs Pipe added<br />

Appendix B Denver Fig E‐2 Add "Remnant" to Miss Gulch label Label changed<br />

Appendix B Denver Fig E‐2 Add label for W. Florida Ave. Label added