Final Baseline Hydrology Report - October 2012 - Urban Drainage ...
Final Baseline Hydrology Report - October 2012 - Urban Drainage ...
Final Baseline Hydrology Report - October 2012 - Urban Drainage ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
S Lee St<br />
S Allison St<br />
S Pierce St<br />
FILE: G:\gis_projects\UDFCD_Sanderson_Gulch\active\apps\<strong>Hydrology</strong>_<strong>Report</strong>\Fig_B-7_UDFCD_Sanderson_Gulch_Detention_11x17.mxd, 11/2/<strong>2012</strong>, wilson_wheeler<br />
Low Flows to<br />
Weir Gulch<br />
30" Storm Drain<br />
(Not Modeled)<br />
Jewell Ave<br />
Low Flows to<br />
Bear Creek<br />
30" Storm Drain<br />
(Not Modeled)<br />
Union Blvd<br />
Smith Reservoir<br />
- Irrigation Storage<br />
- Effective Routing<br />
- Private<br />
- 100-Year Capacity<br />
Kipling Pkwy<br />
Smith<br />
Reservoir<br />
Kenderick<br />
Lake<br />
Number 1<br />
Kenderick Lake No. 1<br />
- City-Owned<br />
- Irrigation Storage<br />
- Effective Routing Reservoir<br />
- 44 AC Tributary<br />
- 100-Year Capacity<br />
No. DATE DESCRIPTION APPR.<br />
East<br />
Reservoir<br />
Kipling Pkwy<br />
Kendrick<br />
Reservoir<br />
S Holland Ct<br />
Irrigation Flows to<br />
East Reservoir<br />
Kenderick Reservoir<br />
- City-Owned<br />
- Effective Routing Reservoir<br />
- 100-Year Capacity<br />
S Garrison St<br />
Sanctuary Park<br />
Wetland<br />
S Dover Way<br />
Morrison Rd<br />
Wadsworth Blvd<br />
Wadsworth<br />
Jewell Park Pond<br />
- City-Owned<br />
- Effective Routing Reservoir<br />
- Approximate10-Year Capacity<br />
Green Gables Park<br />
- City-Owned<br />
- Detention<br />
- Effective Routing Reservoir<br />
- 100-Year Capacity<br />
designed by:<br />
drawn by:<br />
checked by:<br />
project no.:<br />
date:<br />
Mississippi<br />
N o r<br />
t h S<br />
City of Lakewood<br />
Jefferson County<br />
Ward Reservoir Number 1<br />
- Private<br />
- Effective Routing Reservoir<br />
- 100-Year capacity<br />
WW<br />
RK<br />
12.155.020<br />
8/27/<strong>2012</strong><br />
S Balsam Ct<br />
W Evans Ave<br />
S Wadsworth Blvd<br />
Green Gables<br />
Country Club<br />
Ward Reservoir<br />
No. 2<br />
a n d e r s o n<br />
B e a r<br />
W Florida Ave<br />
Ward Reservoir<br />
Number 1<br />
G u<br />
C r e e k<br />
l<br />
S Harlan Cir<br />
c h<br />
Clairfield<br />
Reservoir<br />
Sheridan Blvd<br />
Green Gables Entrance Road<br />
- City-Owned<br />
- Detention<br />
- Effective Routing Reservoir<br />
- Less than 25-Year Capacity<br />
URBAN DRAINAGE AND FLOOD<br />
CONTROL DISTRICT, CITY & COUNTY<br />
OF DENVER, CITY OF LAKEWOOD<br />
Jefferson County\City of Lakewood<br />
City & County of Denver<br />
S Sheridan Blvd<br />
S<br />
Morrison Rd<br />
a<br />
n d<br />
Clairfield Reservoir<br />
- City-Owned<br />
- Effective Routing Detention<br />
- Approximate 25-Year Capacity<br />
e<br />
r s o n G u<br />
S Tennyson St<br />
Ward Reservoir<br />
Number 5<br />
Harvey Park<br />
Lake<br />
Bit-O-Sea<br />
- Private<br />
- Effective Routing Detention<br />
- Less than 100-Year Capacity<br />
Garfield<br />
Lake<br />
W Arkansas Ave<br />
l c h<br />
Harvey Park Lake<br />
- City-Owned<br />
- Effective Routing Reservoir<br />
- 100-Year capacity<br />
Ward Reservoir Number 5<br />
- Private<br />
- Effective Routing Reservoir<br />
- 100-Year capacity<br />
SANDERSON GULCH<br />
MAJOR DRAINAGEWAY PLAN<br />
S Hazel Ct<br />
Federal Blvd<br />
W Kentucky Ave<br />
Federal Blvd<br />
Huston<br />
Lake<br />
Q100= 90 cfs<br />
Q100= 987 cfs<br />
Q100= 307 cfs<br />
S Zuni St<br />
Q100= 71 cfs<br />
Jewell Ave<br />
Q100= 775 cfs<br />
MODELED DETENTION PONDS<br />
AND SPLIT FLOWS<br />
Mississippi<br />
Gulch<br />
Remnant<br />
S Lipan St<br />
S o<br />
u t<br />
h P<br />
l a t<br />
R i v e r<br />
t e<br />
0 0.25 0.5 1<br />
Miles<br />
FIGURE<br />
B-7