IX. OBLIGATIONS OF THE CONTRACTOR<br />

A. DELIVERY<br />

7. Supplier shall deliver at his own expense <strong>the</strong> awarded items at <strong>the</strong><br />

a<strong>for</strong>ementioned NFA installations within thirty (30) calendar days upon<br />

receipt <strong>of</strong> <strong>the</strong> Notice to Proceed. Delivery shall be covered by a Charge<br />

Invoice <strong>and</strong> Delivery Receipt.<br />

8. Shall undertake <strong>the</strong> fitting/installation <strong>of</strong> <strong>the</strong> following <strong>rice</strong> <strong>mill</strong> <strong>parts</strong>:<br />

abrasive rollers, screwed iron roller, pawl, iron roller, per<strong>for</strong>ated steel<br />

plates <strong>and</strong> per<strong>for</strong>ated steel screens, to ascertain con<strong>for</strong>mity to<br />

specifications.<br />

9. Shall personally or through his authorized representative, witness <strong>the</strong><br />

inspection/physical verification to be conducted by <strong>the</strong> inspection team.<br />

10. Shall replace all rejected items within ten (10) calendar days from receipt<br />

<strong>of</strong> <strong>the</strong> Notice <strong>of</strong> Rejection <strong>and</strong> that said rejected items shall remain with<br />

NFA to be withdrawn only upon delivery <strong>and</strong> acceptance <strong>of</strong> <strong>the</strong><br />

replacement.<br />

11. Failure to deliver <strong>and</strong> fit/install <strong>the</strong> materials on <strong>the</strong> specified period <strong>for</strong><br />

any cause not attributable to NFA shall make <strong>the</strong> supplier liable to<br />

liquidated damages as specified under Item X.<br />

12. All expenses, losses <strong>and</strong> damages which may be incurred while <strong>the</strong> items<br />

<strong>for</strong> delivery are in transit to <strong>the</strong> identified NFA installations shall be borne<br />

by <strong>the</strong> supplier.<br />

B. BILLING<br />

Supplier shall bill NFA upon completion <strong>of</strong> <strong>the</strong> delivery <strong>of</strong> <strong>the</strong> <strong>bid</strong> quantity <strong>and</strong><br />

shall be paid within fifteen (15) working days after <strong>the</strong> complete submission <strong>of</strong><br />

<strong>the</strong> required <strong>documents</strong>.<br />

X. LIABILITIES OF THE CONTRACTOR<br />

A. LIQUIDATED DAMAGES<br />

4. For failure to satisfactorily deliver <strong>the</strong> materials under <strong>the</strong> contract within <strong>the</strong><br />

delivery period as stated, inclusive <strong>of</strong> duly granted time extensions, if any, <strong>the</strong><br />

supplier shall be liable <strong>for</strong> damages <strong>for</strong> <strong>the</strong> delay <strong>and</strong> shall pay <strong>the</strong> NFA<br />

liquidated damages, not by way <strong>of</strong> penalty, an amount equal to 1/10 <strong>of</strong> 1% <strong>of</strong><br />

<strong>the</strong> cost <strong>of</strong> <strong>the</strong> delayed materials scheduled <strong>for</strong> delivery <strong>for</strong> every day <strong>of</strong> delay<br />

until such materials are finally delivered <strong>and</strong> accepted by <strong>the</strong> NFA.<br />

5. Such amount shall be deducted from any money due or which may become due<br />

<strong>the</strong> supplier, or collected from any securities or warranties posted by <strong>the</strong><br />