10.04.2015 Views

bid documents for the procurement of rice mill parts and ...

bid documents for the procurement of rice mill parts and ...

bid documents for the procurement of rice mill parts and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. The amount <strong>of</strong> P109,002.55, if <strong>bid</strong> security is in Surety Bond; or<br />

3. Any combination <strong>of</strong> <strong>the</strong> <strong>for</strong>egoing proportionate to <strong>the</strong> share <strong>of</strong> <strong>for</strong>m with<br />

respect to total amount <strong>of</strong> security; <strong>and</strong><br />

4. Bid Securing Declaration.<br />

18.2 The <strong>bid</strong> security shall be valid until June 04, 2013.<br />

20.3 Each Bidder shall submit one (1) original <strong>and</strong> two (2) certified photocopies <strong>of</strong> <strong>the</strong><br />

first <strong>and</strong> second components <strong>of</strong> its <strong>bid</strong> following Annex A on <strong>the</strong> Sealing <strong>and</strong><br />

Marking <strong>of</strong> Bids.<br />

21 The address <strong>for</strong> submission <strong>of</strong> <strong>bid</strong>s is National Food Authority Regional Office I,<br />

Urbiztondo, San Juan, 2514 La Union.<br />

The deadline <strong>for</strong> submission <strong>of</strong> <strong>bid</strong>s is on February 04, 2013, 09:00 AM.<br />

24.1 The place <strong>of</strong> <strong>bid</strong> opening is National Food Authority Regional Office I,<br />

Urbiztondo, San Juan, La Union.<br />

The date <strong>and</strong> time <strong>of</strong> <strong>bid</strong> opening is on February 04, 2013, 09:00 AM onwards.<br />

24.2 No fur<strong>the</strong>r instructions.<br />

27.1 No fur<strong>the</strong>r instructions.<br />

28.3 Grouping <strong>and</strong> Evaluation <strong>of</strong> Lots –<br />

All Goods are grouped in lots listed below. Bidders shall have <strong>the</strong> option <strong>of</strong><br />

submitting a proposal on any or all lots <strong>and</strong> evaluation <strong>and</strong> contract award will be<br />

undertaken on a per lot basis. Lots shall not be divided fur<strong>the</strong>r into sub-lots <strong>for</strong> <strong>the</strong><br />

purpose <strong>of</strong> <strong>bid</strong>ding, evaluation <strong>and</strong> contract award.<br />

LOT<br />

O.<br />

PARTICULARS SPECIFICATIO QTY<br />

(pcs)<br />

ABC<br />

(Php)<br />

1 2.5 TPH SATAKE<br />

RICEMILL<br />

Dingras, Ilocos Norte Abrasive Roller (small) 1 35,000.00<br />

Abrasive Roller (big) 3 105,000.00<br />

Screwed Iron Roller 1 135,000.00<br />

Pawl 8 8,400.00<br />

2 5.0 TPH SATAKE<br />

Iron Roller 1 84,500.00<br />

Resistance Piece 27 40,500.00<br />

Per<strong>for</strong>ate Steel Plate 6 117,000.00<br />

Ball Bearing 6302 10 3,250.00<br />

Ball Bearing 6204 10 2,400.00<br />

Ball Bearing 6203 10 2,050.00<br />

Ball Bearing 6206 10 3,640.00<br />

Ball Bearing 6211 10 9,100.00<br />

Elevator Bucket, 5" (Plastic) 100 5,000.00<br />

Sub-Total 550,840.00<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!