You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
V E C T O R O W N E R ’ S M A N U A L<br />
3. Finally, thread the end of the bridle back<br />
through the opposite end of the bridle.<br />
MAIN CANOPY PACKING INSTRUCTIONS<br />
Instructions for packing specific main canopies are published by the canopy manufacturer and are beyond the scope of<br />
this manual.<br />
ABOUT THE DEPLOYMENT BRAKES<br />
Every ram-air canopy on the market today is equipped with “deployment brakes” to make it open more gently and<br />
reliably. The brakes work by keeping the tail of the canopy pulled down several inches during deployment. This prevents<br />
the canopy from surging forward as it inflates and begins flying.<br />
Malfunctions and poor deployments may result if the brakes are not set during packing, if the brakes are incorrectly set,<br />
or if one or both brakes release before complete canopy inflation and stabilization. Incompatible toggle and riser<br />
combinations may also create similar problems.<br />
Not all harness and container systems have risers that are configured like those shipped with the Vector 3. Different<br />
riser designs require different procedures and a rigger should be consulted for the correct one.<br />
Page • 48:88 section 4 : setting up pull out system<br />
09354 - 11/26/2003<br />
Rev 0