21.06.2015 Views

Proceedings - C-SRNWP Project

Proceedings - C-SRNWP Project

Proceedings - C-SRNWP Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contacts with the Academia<br />

In his draft Programme Proposal the Programme Manager has raised the issue of the low<br />

degree of collaboration between the <strong>SRNWP</strong> Programme and the Academia. Quote: "In<br />

Europe, the collaboration of the NMS with Academia should be intensified. This was also the<br />

wish of the NWP Vision Meeting of March 2006 at the ECMWF which has passed a<br />

recommendation in order to develop better working relationship with Academia".<br />

As the idea of common European Conferences on NWP will not be followed, it has been<br />

proposed at the meeting that the contact in NWP between the NMS and the Academia should<br />

be realised through the Working Groups. The WG members will know in their field of<br />

research their colleagues of the Universities. A good starting point for an enhanced<br />

collaboration would be to open the <strong>SRNWP</strong> Workshops to the relevant specialists working at<br />

Universities.<br />

Preparation of the Programme Proposal and Programme Decision for<br />

the EUMETNET Council<br />

The present phase of the <strong>SRNWP</strong> Programme ends the 31st of December 2007.<br />

The Programme Proposal and the Programme Decision have to be sent to the EUMETNET<br />

Secretariat the 30th of April 2007 at the latest.<br />

We can presently forget about the Programme Decision which can be considered as a<br />

summary of the Programme Proposal and can be rapidly prepared if the Programme Proposal<br />

treats accurately all the relevant issues.<br />

It has been decided at the meeting to form a "Programme Redaction Committee" for the<br />

preparation of the Programme Proposal. We agreed on 3 persons per Consortium. This would<br />

give of group of 15 persons, 16 with the Programme Manager. This is too large a group. Two<br />

representatives per Consortium would give together 11 persons. This would be more than<br />

enough.<br />

The review of the present report by the Local Organizer of the Zurich Meeting is cordially<br />

acknowledged.<br />

For the report:<br />

Jean Quiby<br />

<strong>SRNWP</strong> Programme Manager<br />

301

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!