10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A1-4 (Continued)Mining Lease RequirementsConditionNumberCondition19 Operations must not interfere with or impair the stability or efficiency of any transmission line,communication line, pipeline or any other utility on the lease area without prior written approval of theDirector-General and subject to any conditions he may stipulate.20 (a) Activities on the lease must not interfere with or damage fences without the prior written approval ofthe owner thereof or the Minister and subject to any conditions the Minister may stipulate.21 (a) Operations must not affect any road unless in accordance with an accepted Mining Operations <strong>Plan</strong> orwith the prior written approval of the Director-General and subject to any conditions he may stipulate.29 (a) Notwithstanding any Mining Operations <strong>Plan</strong>, the leaseholder mush not mine within any part of thelease area which is within the notification area of the Wambo Tailings Dam and United CollieryTailings 2 Dam without the prior written approval of the Minister and subject to any conditions that hemay stipulate.Document Reference/CommentAppendix D (Built Features Management <strong>Plan</strong>)An Ausgrid 11 kV powerline is the only assetwithin the Longwalls 7 and 8 Application Area thatis not owned by WCPL.Appendix B (Land Management <strong>Plan</strong>)All fences within the Longwalls 7 and 8Application Area are WCPL-owned.Appendix B (Land Management <strong>Plan</strong>) andAppendix D (Built Features Management <strong>Plan</strong>)All roads and tracks within the Longwalls 7 and 8Application Area are WCPL-owned.The Longwalls 7 and 8 Application Area extendsinto the Notification Area of the Wambo TailingsDam (North East Tailings Dam) (NA-56).WCPL will prepare and submit an application formining within the North East Tailings DamNotification Area to the Dams Safety Committeeprior to mining within this area (Appendix D).EP/SMP LW7-8 Rev B December 2012 Page A1-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!