<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A1-2 (Continued)Development Consent DA 305-7-2003 RequirementsConditionNumber(Schedule 4)<strong>Extraction</strong> <strong>Plan</strong>Condition22C. The Applicant shall prepare and implement an <strong>Extraction</strong> <strong>Plan</strong> for the second workings withineach seam to be mined to the satisfaction of the Director-General. Each <strong>Extraction</strong> <strong>Plan</strong>must:(a)(b)(c)(d)(e)(f)(g)be prepared by a team of suitably qualified and experienced persons whoseappointment has been endorsed by the Director-General;be approved by the Director-General before the Applicant carries out any of thesecond workings covered by the plan;include detailed plans of the proposed first and second workings and any associatedsurface development;include detailed performance indicators for each of the performance measures inTables 14A and 14B;provide revised predictions of the potential subsidence effects, subsidence impacts andenvironmental consequences of the proposed second workings, incorporating anyrelevant information obtained since this consent;describe the measures that would be implemented to ensure compliance with theperformance measures in Tables 14A and 14B, and manage or remediate any impactsand/or environmental consequences;include the following to the satisfaction of DII:a coal resource recovery plan that demonstrates effective recovery of the availableresource;a subsidence monitoring program to:– provide data to assist with the management of the risks associated withsubsidence;– validate the subsidence predictions; and– analyse the relationship between the subsidence effects and impacts under theplan and any ensuing environmental consequences;Document Reference/CommentSection 1.1 and Attachment 2This ApplicationSection 1.3 and Appendix G (Coal Resource Recovery <strong>Plan</strong>)Section 3 and Appendices A, C, D, E and FSection 2.1 and Reports 1 to 5Section 3 and Appendices A to F, H and IAppendix G (Coal Resource Recovery <strong>Plan</strong>)Section 3.8 and Appendix H (Subsidence MonitoringProgram)EP/SMP LW7-8 Rev B December 2012 Page A1-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!