10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table 16Built Feature Management Associated with the <strong>Extraction</strong> of Longwalls 7 and 8Issue Monitoring ManagementWCPLAssetsPrescribedDamsAusgridAssets• Monitoring ofsubsidence inaccordance with theSubsidence MonitoringProgram (Appendix H).• Visual inspections asdescribed in Section 3.8and the SubsidenceMonitoring Program(Appendix H).• Assessment of WCPL assets to identify modifications potentially required prior to subsidence.• Maintenance of safe access to WCPL assets such that WCPL personnel are able to undertake routinemaintenance and remediation works as required.• Implementation of communication protocols to ensure internal WCPL stakeholders are aware of the longwallprogression and are able to provide sufficient notification to relevant WCPL personnel regarding potentialsubsidence to WCPL assets.• Posting of warning signs at suitable locations on old haul roads and site access tracks and updating warningsigns if a change to the WCPL asset is identified during monitoring.• Provision of 15 m separation barrier around the Homestead pit highwall.• Following subsidence, fitting of WCPL powerlines with stays where affected by subsidence.• Structural assessment of WCPL assets and subsidence assessment post-Longwalls 7 and 8 extraction.• Repair of WCPL assets in accordance with associated standards and procedures.• Lowering the inundation level to an extent outside of the angle of draw prior to extraction of Longwall 8 withina 26.5° angle of draw to the South Wambo Dam inundation area. 1• Structural assessment of South Wambo Dam following completion of active mining. 1• Repair of any damage to the Prescribed Dam resulting from the extraction of Longwalls 7 and 8 (i.e. WCPLwill restore the safety of any Prescribed Dam if compromised by mining). 1• Decommissioning of powerline prior to subsidence.• If not decommissioned, preparation of an AAMP in consultation with Ausgrid for the management of thispowerline.1 Potential management measure only, actual management measures would be developed as part the application to the DSC.EP/SMP LW7-8 Rev B December 2012 Page 42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!