10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A1-2Development Consent DA 305-7-2003 RequirementsConditionNumber(Schedule 4)ConditionPerformance Measures – Natural and Heritage Features, etc22. The Applicant shall ensure that the development does not cause any exceedances of theperformance measures in Table 14A, to the satisfaction of the Director-General.Document Reference/CommentThis <strong>Extraction</strong> <strong>Plan</strong> has been developed to meet thesubsidence impact performance measures.Table 14A: Subsidence Impact Performance MeasuresWaterWollombi BrookBiodiversityWollemi National ParkWarkworth Sands WoodlandCommunityWhite Box, Yellow Box, Blakely’sRed Gum Woodland/Grassy WhiteBox Woodland CommunityHeritageWambo Homestead ComplexNegligible Impact.Controlled release of excess site water only inaccordance with EPL requirementsNil impact.Minor cracking and ponding of the land surface orother impact.Negligible environmental consequencesMinor cracking and ponding of the land surface orother impact.Negligible environmental consequencesNegligible impact on heritage values, unlessapproval has been granted by the Heritage Branchand/or the MinisterSection 3.1 and Appendix A (Water Management <strong>Plan</strong>)Section 3.3 and Appendix C (Biodiversity Management <strong>Plan</strong>)Section 3.5 and Appendix E (Heritage Management <strong>Plan</strong>)EP/SMP LW7-8 Rev B December 2012 Page A1-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!