<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A1-4 (Continued)Mining Lease RequirementsConditionNumberCoal Lease 397Condition1 (d) Where the registered holder desires to commence and to carry out underground mining operationswithin the subject area or where the Minister notifies the registered holder that he proposes to issue adirection pursuant to paragraph (c) of this condition the registered holder shall furnish to the Minister aplan showing the proposed workings in the section of land to be so mined together with such otherdetails as the Minister may require.26 The registered holder shall not interfere in any way with any fences on or adjacent to the subject areaunless with the prior written approval of the owner thereof of the Minister and subject to such conditions asthe Minister may stipulate.27 The registered holder shall observe any instruction given or which may be given by the Minister with a viewto minimising or preventing public inconvenience or damage to public or private property.30 Subject to any specific condition of this lease providing for rehabilitation of any particular part of the subjectarea affected by mining or activities associated therewith, the registered holder shall;(a)(b)reinstate, level, regrass, reforest and contour to the satisfaction of the Minister, any part of the subjectarea that may in the opinion of the Minister have been damaged or deleteriously affected by miningoperations; andfill in, seal or fence, to the satisfaction of the Minister, any excavation within the subject area.31 If requested so to do by the Minister and within such time as may be stipulated by the Minister the registeredholder shall carry out to the satisfaction of the Minister surveys of structures, buildings and pipelines onadjacent landholdings to determine the effect of operations on any such structures, buildings and pipelines.33 If so directed by the Minister the registered holder shall rehabilitate to the satisfaction of the Minister andwithin such time as may be allowed by the Minister any lands within the subject area which may have beendisturbed by the operations hereby authorised.Document Reference/CommentWorkings the subject of this application areshown on the SMP Approved <strong>Plan</strong> ofAppendix G.Appendix B (Land Management <strong>Plan</strong>)All fences within the Longwalls 7 and 8Application Area are WCPL-owned.Appendix D (Built Features Management <strong>Plan</strong>)An Ausgrid 11 kV powerline is the only assetwithin the Longwalls 7 and 8 Application Area thatis not owned by WCPL.Appendix I (Rehabilitation Management <strong>Plan</strong>)Pre-mining inspections are outlined inAppendix D (Built Features Management <strong>Plan</strong>)An Ausgrid 11 kV powerline is the only assetwithin the Longwalls 7 and 8 Application Area thatis not owned by WCPL.Appendix I (Rehabilitation Management <strong>Plan</strong>)EP/SMP LW7-8 Rev B December 2012 Page A1-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!