<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table 7 (Continued)Key Potential Consequences/Hazards Identified by the Subsidence Risk AssessmentSubjectAreaMineInfrastructureItems ofHeritageSignificanceOtherPotential Consequence HazardLoss of capacity of water storages due to fracturing to thewater storage floors resulting from extraction ofLongwalls 7 and 8.Mine subsidence impacts to WCPL mine dewateringdischarge pipelines.Instability of the highwall in the Homestead pit as a resultof subsidence impacts.Subsidence impacts on all-weather site access track tosouthern area resulting in inability to access criticalinfrastructure.Structural damage to wells and bores close to the minefootprint (including old United Mine gas bores).Impacts on drainage within the Homestead pit, inparticular drainage to the fan bench from rehabilitatedareas.Stud Master’s Cottage (WHC) compromised bysubsidence from Longwall 7.Failure of timing or effectiveness of Homestead backfillproject (grouting of historic Homestead Mine workings inthe Whybrow Seam).Interaction of Wambo Seam fractured zone with overlyingWhybrow Seam fractured zone result in increased watermake in the underground workings.Impact on adjacent historic workings in the Wambo Seam<strong>Extraction</strong> <strong>Plan</strong>ReferenceSection 3.4 and BFMP(Appendix D)Section 3.5 and HMP(Appendix E)Section 1.6.2Coal Resource Recovery<strong>Plan</strong> (Appendix G)Coal Resource Recovery<strong>Plan</strong> (Appendix G)Failure to implement the approved <strong>Extraction</strong> <strong>Plan</strong>. Section 42.3 CONSULTATIONConsultation has been conducted for the <strong>Extraction</strong> <strong>Plan</strong> in accordance with the requirements of theDevelopment Consent (DA 305-7-2003) and in consideration of the SMP Guideline. Consultation withrelevant stakeholders is described further below.Evidence of WCPL’s consultation process for the <strong>Extraction</strong> <strong>Plan</strong> is provided in Attachment 2.2.3.1 Government AgenciesA summary of the consultation with government agencies and the key issues raised is provided inTable 8. Draft management plans were distributed for comment as required under Condition 22C ofthe Development Consent (DA 305-7-2003), as summarised in Table 9. There are no ‘affected publicauthorities’ relevant to the Longwalls 7 and 8 Application Area, therefore the LMP was not distributedfor comment.EP/SMP LW7-8 Rev B December 2012 Page 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!