10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table 24Summary of Reporting FrameworkReport Frequency DistributionIncidentReportMonthlyStatus UpdateSubsidenceManagementStatus ReportAnnualReviewAs required – seeSection 4.2.1Email distributedmonthly or where newimpact identified orsubsidenceexceedance occursEvery six monthsAnnual(for the period 1 Julyto 30 June)DP&I (Manager – Mining Projects)DRE (Director – Environmental Sustainability)DRE (Principal Subsidence Engineer [PSE])MSB (District Manager)Ausgrid (Manager – Customer Supply Upper Hunter) 2DSC (Executive Engineer) 3Other regulators as specified in management plans.DistributionMethod 1EmailResponsibility for DataCollation and PreparationEnvironment andCommunity ManagerDP&I (Manager, Mining Projects)DRE (Director – Environmental Sustainability)DRE (PSE c/- Subsidence Executive Officer)MSB (District Manager)NOW (Mines Assessment and <strong>Plan</strong>ning)Ausgrid (Manager – Customer Supply Upper Hunter)DSC (Executive Engineer) 3 Email Technical ServicesSuperintendentEnvironment andCommunity Manager2DP&I (Manager, Mining Projects)DRE (Director – Environmental Sustainability)DP&I (Manager, Mining Projects)DRE (Director – Environmental Sustainability)MSB (District Manager)OEH/EPA (General Contact)NOW (Mines Assessment and <strong>Plan</strong>ning)Singleton Shire Council (General Manager)CCC MembersEmailEmail andPost1 See Attachment 4 for distribution details.2 If the Ausgrid 11 kV powerline is not decommissioned.3 Where the longwall face is within the DSC Notification Area of the South Wambo Dam or the North East Tailings Dam.Environment andCommunity ManagerEnvironment andCommunity ManagerResponsibility forSubmissionGeneral ManagerTechnical ServicesSuperintendent(in consultation withUnderground Mine Manager,Environment and CommunityManager and TechnicalServices Manager)General ManagerGeneral ManagerEP/SMP LW7-8 Rev B December 2012 Page 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!