10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Attachment 1Statutory RequirementsThis Attachment outlines relevant statutory and guideline requirements and provides the relevantsection of the <strong>Extraction</strong> <strong>Plan</strong> where the requirements are addressed. This Attachment considers thestatutory instruments and guidelines in Table A1-1.Table A1-1Relevant Statutory Instruments and GuidelinesStatutory Instrument or GuidelineAttachment 1 ReferenceDevelopment Consent (DA 305-7-2003) Table A1-2Guideline for Applications for Subsidence Management <strong>Plan</strong>Approvals (DMR, 2003)Table A1-3Mining Lease Conditions Table A1-4Approval of Application under Section 60 of the Heritage Act, 1977 forExtension of Underground Longwall Mining into the WamboHomestead Curtilage (2012/S60/30)Table A1-5EP/SMP LW7-8 Rev B December 2012 Page A1-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!