10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table 8 (Continued)Summary of Consultation with Government AgenciesAgency Consultation Conducted Key Issues RaisedDepartment ofPrimaryIndustries –Fisheries(DPI-Fisheries)NSW MineSubsidenceBoard (MSB)NSW DamsSafetyCommittee(DSC)• 14 September 2012 – briefing email andinvitation to risk assessment workshop.• 1 November 2012 – draft BMP provided.• 7 November 2012 – letter advising thatDPI-Fisheries has no objections to theBMP and the proposed management andcontingency measures proposed areadequate.• 14 September 2012 – briefing email andinvitation to risk assessment workshop.• 10 October 2012 – attendance at morningsession of risk assessment workshop.• 14 September 2012 – briefing email andinvitation to risk assessment workshop.• 23 November 2012 – briefing provided.Table 9Draft Management <strong>Plan</strong>s Distributed for Comment• No issues raised.• No objection to the BMP.• Consideration of impacts onAusgrid-owned infrastructure(Appendix D).• Revision of South Wambo DamNotification Area (DSC meetingin December to review)(Appendix D).• An application to mine within anotification needs to beapproved by DSC prior tomining within notification area.(the South Wambo Dam is notyet part of lease conditions andtherefore at this stage the ChiefInspector of Mines does notapprove application)(Appendix D).Management <strong>Plan</strong> Agencies Date DistributedWater Management <strong>Plan</strong> DP&I, NOW, EPA 6 November 2012Biodiversity Management <strong>Plan</strong> DP&I, OEH, DRE, DPI-Fisheries 1 November 2012Heritage Management <strong>Plan</strong> DP&I, OEH, Heritage Branch (OEH) 6 November 2012Subsidence Monitoring Program DRE 8 November 20122.3.2 Infrastructure OwnersThe only infrastructure within the Longwalls 7 and 8 Application Area not owned by WCPL is an 11 kVpowerline owned by Ausgrid.WCPL has consulted with Ausgrid regarding the long-term management of this powerline. Ausgridhas identified the powerline as "not in use" and WCPL and Ausgrid have commenced discussions andassessments to decommission the line.If the section of line is not decommissioned, WCPL would prepare an Ausgrid Asset Management<strong>Plan</strong> (AAMP) in consultation with Ausgrid for the management of this powerline.EP/SMP LW7-8 Rev B December 2012 Page 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!