10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table 1<strong>Extraction</strong> <strong>Plan</strong> RequirementsDevelopment Consent (DA 305-7-2003) ConditionCondition 22C of Schedule 422C.The Applicant shall prepare and implement an <strong>Extraction</strong> <strong>Plan</strong> for thesecond workings within each seam to be mined to the satisfaction of theDirector-General. Each <strong>Extraction</strong> <strong>Plan</strong> must:a) be prepared by a team of suitably qualified persons whoseappointment has been endorsed by the Director-General;b) be approved by the Director-General before the Applicant carries outan of the second workings covered by the plan;c) include detailed plans of the proposed first and second workings andany associated surface development;d) included detailed performance indicators for each of the performancemeasures in Tables 14A and 14B;e) provide revised predictions of potential subsidence effects,subsidence impacts and environmental consequences of theproposed second workings, incorporating any relevant informationobtained since this consent;f) describe the measures that would be implemented to ensurecompliance with the performance measures in Tables 14A and 14B,and manage or remediate any impacts and/or environmentalconsequences;g) include the following to the satisfaction of the DRE:<strong>Extraction</strong> <strong>Plan</strong>ReferenceThis documentSection 1.1 andAttachment 2Section 1.3 andAppendix GSection 3 andAppendices A, C, D, Eand FSection 2.1 andTechnical Reports 1to 5Section 3 andAppendices A, B, C,D, E, F, H and I• a coal resource recovery plan… Appendix G• a subsidence monitoring program… Appendix H• a Built Features Management <strong>Plan</strong>… Appendix D• a Public Safety Management <strong>Plan</strong>… Appendix F• appropriate revisions to the Rehabilitation Management <strong>Plan</strong>… Section 3.7h) include a:• Water Management <strong>Plan</strong>… Appendix A• Biodiversity Management <strong>Plan</strong>… Appendix C• Land Management <strong>Plan</strong>… Appendix B• Heritage Management <strong>Plan</strong>… Appendix Ei) include a program to collect sufficient baseline data for future<strong>Extraction</strong> <strong>Plan</strong>s.Attachment 3EP/SMP LW7-8 Rev B December 2012 Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!