10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A3-1Program to Collect Baseline Data for Future <strong>Extraction</strong> <strong>Plan</strong>sAspect of Future <strong>Extraction</strong><strong>Plan</strong>Proposed MonitoringSubsidence Subsidence monitoring undertaken in accordance with the Subsidence Monitoring Program. The subsidence monitoring data collected during extraction of Longwalls 7 and 8 will be used to validate revisedsubsidence predictions for future <strong>Extraction</strong> <strong>Plan</strong>s.It is considered that the proposed subsidence monitoring is adequate to collect sufficient subsidence data for use infuture <strong>Extraction</strong> <strong>Plan</strong>s.Groundwater Groundwater monitoring (groundwater level and quality) undertaken in accordance with the GWMP and NWCSRS(monitoring will include the two new piezometers discussed in the NWCSRS, P-NWU-03a and P-NWU-05a)(Figure A3-1).A number of new groundwater monitoring sites are proposed to be installed within WCPL-owned mining tenements.These groundwater monitoring sites would be incorporated in the GWMP.At the time of writing 20 new groundwater monitoring sites have been installed (including P-NWU-03a and P-NWU-05a)as shown on Figure A3-1. Data collected from these groundwater monitoring sites (including piezometers andstandpipes) will contribute towards baseline data for North Wambo Underground Mine Longwalls 9 and 10 and theSouth Wambo Underground Mine.The groundwater monitoring data collected will be used to validate predicted environmental consequences ongroundwater resources for future <strong>Extraction</strong> <strong>Plan</strong>s. If this validation finds environmental consequences have exceededthose predicted, the groundwater monitoring data will be used to provide revised predictions of environmentalconsequences.It is considered that the proposed groundwater monitoring is adequate to collect sufficient groundwater data for use infuture <strong>Extraction</strong> <strong>Plan</strong>s.EP/SMP LW7-8 Rev B December 2012 Page A3-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!