10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A1-2 (Continued)Development Consent DA 305-7-2003 RequirementsConditionNumber(Schedule 4)Conditiona Built Features Management <strong>Plan</strong> to manage the potential subsidence impactsand/or environmental consequences of the proposed second workings, and which:– addresses in appropriate detail all items of public infrastructure and all classesof other built features; and– has been prepared following appropriate consultation with the owner/s ofpotentially affected feature/s;Document Reference/CommentSection 3.4 and Appendix D (Built Features Management<strong>Plan</strong>) and component plans a Public Safety Management <strong>Plan</strong> to ensure public safety in the mining area; and Section 3.6 and Appendix F (Public Safety Management <strong>Plan</strong>)(h) include a:appropriate revisions to the Rehabilitation Management <strong>Plan</strong> required undercondition 40A; andWater Management <strong>Plan</strong>, which has been prepared in consultation with DECCWand NOW, which provides for the management of the potential impacts and/orenvironmental consequences of the proposed second workings on surface waterresources, groundwater resources and flooding, and which includes:– surface and groundwater impact assessment criteria, including trigger levels forinvestigating any potentially adverse impacts on water resources or waterquality;– a program to monitor and report groundwater inflows to underground workings;and– a program to manage and monitor impacts on groundwater bores on privatelyownedland;The existing Rehabilitation Management <strong>Plan</strong> was developedin December 2011 and reviewed by the DRE in May 2012.The Rehabilitation Management <strong>Plan</strong> has not been revised forthis <strong>Extraction</strong> <strong>Plan</strong> (Section 3.7).The Rehabilitation Management <strong>Plan</strong> is provided inAppendix I.Section 3.1 and Appendix A (Water Management <strong>Plan</strong>)A draft of the Water Management <strong>Plan</strong> was provided to theEnvironment Protection Authority and the NSW Office ofWater on 6 November 2012.EP/SMP LW7-8 Rev B December 2012 Page A1-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!