10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8The component management plans of this <strong>Extraction</strong> <strong>Plan</strong> reference components of a number ofexisting Environmental Management <strong>Plan</strong>s to avoid duplication (Section 3). If these EnvironmentalManagement <strong>Plan</strong>s are revised separately in accordance with the Development Consent(DA 305-7-2003) the management plans will be updated accordingly.Separately, WCPL is preparing an application to modify the Development Consent (DA 305-7-2003MOD 13) to allow for two additional longwalls at the North Wambo Underground Mine (Longwalls 9and 10) (Figure 3). Longwalls 9 and 10 would be the subject of a new <strong>Extraction</strong> <strong>Plan</strong> or a revision ofthis <strong>Extraction</strong> <strong>Plan</strong>.4.4 REVIEW OF OTHER MANAGEMENT PLANSAs part of the application under clause 88 of the Coal Mine Health and Safety Regulation, 2006 forlongwall mining of Longwalls 7 and 8, WCPL will revise the Inrush Management <strong>Plan</strong> and SlopeStability Management <strong>Plan</strong> to incorporate Longwalls 7 and 8.As part of the Subsidence Risk Assessment (Technical Report 4), WCPL identified an action torevise the Site Water Management <strong>Plan</strong> to incorporate the implications of:• dewatering of the overlying Whybrow Seam above Longwalls 7 and 8;• removal of water against the Homestead Mine portals to mitigate risk of inrush; and• any reduction in the storage capacity of South Wambo Dam to minimise potential subsidenceimpacts of Longwall 8.The Site Water Mangement <strong>Plan</strong> would be revised in accordance with the Development Consent(DA 305-7-2003) and submitted by the end of March 2013.4.5 KEY RESPONSIBILITIESKey responsibilities under this <strong>Extraction</strong> <strong>Plan</strong> are summarised in Table 25. The componentmanagement plans provide additional responsibilities under the plans. A summary WCPLorganisation structure is provided in Figure 14.EP/SMP LW7-8 Rev B December 2012 Page 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!