10.07.2015 Views

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

Extraction Plan - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A1-5Requirements of the Approval of Application under Section 60 of the Heritage Act, 1977 (2012/S60/30)ConditionNumberCondition1 A conservation management plan (CMP) for the Wambo Homestead Complex (WHC) is to be prepared forEndorsement by the Heritage Council of NSW or its Delegate within 12 months of the date of this consent.The CMP is to include priority/programmed/staged work schedules with active measures to arrest decay, torepair and to preserve all remaining original fabric during the related mining process, after the expectedsubsidence from that mining process and when a future use is determined. The objective must be to ensurethat the WHC remains in a .conserved state that would keep it available for future adaptive re­use at aviable cost after the conclusion of active mining operations.2 The conservation policies and an interpretation strategy contained in the Conservation Management <strong>Plan</strong>are to be implemented in accordance with a timetable to be contained in the CMP and approved by HeritageCouncil of NSW or its Delegate.3 A suitably qualified and experienced oral history consultant is to be engaged by the applicant to undertakean oral history of the Wambo Homestead Complex having regard to the strong associations of members ofthe local community and past owners with the site. The oral history is to be provided to the Heritage Councilof NSW or its Delegate within 24 months of the date of this consent.4 In circumstances where safe access to the Wambo Homestead Complex is able to be provided,opportunities are to be offered to the local community to visit the site during and after its conservation. Thisshould be considered as part of the Interpretation strategy which is to be included in the ConservationManagement <strong>Plan</strong>.5 The impact management and remediation strategies for the Wambo Homestead Complex Buildingsrecommended in the specialist reports which accompanied the S60 Application are to be implemented inconjunction with the longwall mining of NW LW 7 and 8 approved under this consent. Other measures to beincorporated as part of the work must include the installation of stress/strain/ movement gauges linked to anappropriate recording and monitoring system.Document Reference/CommentThe Conservation Management <strong>Plan</strong> (CMP) forthe WHC will be revised separately in accordancewith this condition and Condition 58 of theDevelopment Consent (DA 305-7-2003).To be implemented through the CMP.To be implemented through the CMP.To be implemented through the CMP.The Wambo Homestead Complex MineManagement <strong>Plan</strong> (WHCMMP) is a component ofthe Heritage Management <strong>Plan</strong> (Appendix E).EP/SMP LW7-8 Rev B December 2012 Page A1-23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!