<strong>Extraction</strong> <strong>Plan</strong> – North Wambo Underground Mine Longwalls 7 and 8Table A1-3 (Continued)Requirements of the Guideline for Applications for Subsidence Management <strong>Plan</strong> ApprovalsGuidelineSection6.5 Stability of Underground WorkingsRequirementWhere the proposed mine workings are designed to provide support to the surface theapplication should contain the following information:The required levels of surface protection: the maximum allowable subsidenceparameters; andThe proposed mine workings including all dimensions.6.6 Stability of Underground Workings6.6.1 List Surface and Sub-Surface Features Section 3List of surface and sub-surface features.A statement of areas within a Mine Subsidence District;Identification, so far as is practicable, of all man-made structures built before thedeclaration of the Mine Subsidence District, andIdentification of any known, relevant proposed developments (e.g. subdivisions orimprovements), which are proposed for development within the next 7 years or duringthe time of proposed mining. The Mine Subsidence Board, relevant local or stategovernment agencies and public utility authorities are possible sources for thisinformation.6.6.2 Characterisation of Surface and Sub-Surface FeaturesA description of the surface environment of the Application Area (e.g. residential, andidentified sensitive areas);Relevant structural information for each surface improvement or man-made structure;Base-line environmental monitoring data in areas of environmental sensitivity – includeanalysis i.e. list surface and groundwater data collected, including duration andfrequency of sampling and parameters measured;Document Reference/CommentSection 1.3, Appendix G (Coal Resource Recovery <strong>Plan</strong>) andAppendix E (Heritage Management <strong>Plan</strong>)SMP Approved <strong>Plan</strong> of Appendix G (Coal ResourceRecovery <strong>Plan</strong>)Section 3 and Report 1Section 3.4, Appendix D (Built Features Management <strong>Plan</strong>)and Report1Appendices A to I, Report 2 and Report 3EP/SMP LW7-8 Rev B December 2012 Page A1-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!