10.07.2015 Views

2.1 Overview of the Proposed Project - Keystone XL pipeline - US ...

2.1 Overview of the Proposed Project - Keystone XL pipeline - US ...

2.1 Overview of the Proposed Project - Keystone XL pipeline - US ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Draft Supplemental Environmental Impact Statement<strong>Keystone</strong> <strong>XL</strong> <strong>Project</strong><strong>2.1</strong>.4.4 Mainline Valves<strong>Keystone</strong> would install 55 IMLVs along <strong>the</strong> proposed route and 1 MLV at each pump station, all<strong>of</strong> which would be located within <strong>the</strong> permanent ROW as shown in Table <strong>2.1</strong>-8. These IMLVsinclude both manual and remotely operated mainline block valves as well as check valves.Table <strong>2.1</strong>-8Intermediate Mainline Valve LocationsType Mile Post Acres County State aMotor Operated 19.46 0.05 Phillips MontanaCheck 27.94 0.05 Valley MontanaManual 27.94 0.05 Valley MontanaMotor Operated 31.9 0.05 Valley MontanaMotor Operated 63.61 0.05 Valley MontanaCheck 72.61 0.05 Valley MontanaManual 72.61 0.05 Valley MontanaMotor Operated 81.94 0.05 Valley MontanaCheck 85.61 0.05 Valley MontanaManual 85.61 0.05 Valley MontanaMotor Operated 87.92 0.05 Valley MontanaCheck 90.65 0.05 McCone MontanaManual 90.65 0.05 McCone MontanaCheck 91.75 0.05 McCone MontanaManual 91.75 0.05 McCone MontanaMotor Operated 118.36 0.05 McCone MontanaMotor Operated 135.02 0.05 McCone MontanaMotor Operated 170.49 0.05 Dawson MontanaMotor Operated 179.64 0.05 Dawson MontanaMotor Operated 197.35 0.05 Dawson MontanaCheck 198.34 0.05 Dawson MontanaManual 198.34 0.05 Dawson MontanaMotor Operated 221.45 0.05 Fallon MontanaMotor Operated 254.93 0.05 Fallon MontanaMotor Operated 272.24 0.05 Fallon MontanaMotor Operated 301.70 0.05 Harding South DakotaCheck 301.70 0.05 Harding South DakotaMotor Operated 319.72 0.05 Harding South DakotaMotor Operated 353.89 0.05 Harding South DakotaMotor Operated 373.87 0.05 Perkins South DakotaMotor Operated 408.91 0.05 Meade South DakotaMotor Operated 419.68 0.05 Meade South DakotaMotor Operated 436.12 0.05 Haakon South DakotaCheck 436.12 0.05 Haakon South Dakota<strong>Project</strong> Description <strong>2.1</strong>-22 March 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!