10.07.2015 Views

2.1 Overview of the Proposed Project - Keystone XL pipeline - US ...

2.1 Overview of the Proposed Project - Keystone XL pipeline - US ...

2.1 Overview of the Proposed Project - Keystone XL pipeline - US ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Draft Supplemental Environmental Impact Statement<strong>Keystone</strong> <strong>XL</strong> <strong>Project</strong>BaseRouteLength(Miles)RerouteLength(Miles)MaximumPerpendicularDistance fromCenter Line(Feet) Reason for Route Change aHaakonCountyBeginMPEndMPPerkins 366.31 366.82 0.49 0.51 234 To avoid multiple creek crossings. Wouldalso eliminate two <strong>of</strong> <strong>the</strong> three current creekcrossings.Perkins 370.18 370.82 0.59 0.64 701 To shift CL and TWA away from a potentialunmarked grave site and to a moreconstructible creek crossing locale.Meade 380.56 381.20 0.64 0.65 214 To avoid laying <strong>pipeline</strong> along drainagefeature and eliminate one <strong>of</strong> <strong>the</strong> two currentcreek crossings.Meade 388.26 388.90 0.62 0.64 244 To avoid a well and levee.Meade 398.24 400.78 2.55 2.54 733 To avoid multiple stream crossings and moredifficult construction.Meade 424.03 426.52 2.44 2.50 2,225 To shift CL and TWA to avoid ridgelines,rough terrain, and drop-<strong>of</strong>fs, and eliminate<strong>the</strong> one HDD.Meade/ 426.83 436.12 9.00 9.29 1,980 To avoid ridgelines, rough terrain, and drop<strong>of</strong>fs,and eliminate two HDDs. Also toimprove <strong>the</strong> current HDD crossing location<strong>of</strong> <strong>the</strong> Cheyenne River and straighten <strong>the</strong>route to allow <strong>the</strong> use <strong>of</strong> HDD at twolocations south <strong>of</strong> <strong>the</strong> Cheyenne Rivercrossing.Haakon 447.16 448.77 1.59 1.61 788 To avoid a creek crossing that is too close toa road and to avoid impacting a wetland areaand tree removal.Haakon 449.61 450.13 0.51 0.52 270 To avoid laying <strong>pipeline</strong> along a drainagefeature.Haakon 452.01 453.00 0.98 0.99 343 To relocate <strong>the</strong> CL crossing at Highway 73 toa narrower area <strong>of</strong> state-road ROW, reduce<strong>the</strong> crossing length, and avoid steep slopes athighway’s edge. Also relocates <strong>the</strong> <strong>pipeline</strong>away from <strong>the</strong> side slope <strong>of</strong> a meanderingwaterbody.Haakon 455.22 456.75 1.56 1.53 635 To eliminate a PI and straighten <strong>the</strong> route.Haakon 461.83 462.26 0.45 0.43 315 To eliminate a PI and straighten <strong>the</strong> line,place MLV-19A on higher ground, and moveCL/TWA away from an existing culvertsouth <strong>of</strong> current CL.Haakon 475.48 477.77 2.27 2.29 630 To avoid difficult construction and save cost<strong>of</strong> reclamation by avoiding routing along adrainage feature and have a better crossinglocation at a creek. Also avoids three creekcrossings and moves CL away from a pond.<strong>Project</strong> Description <strong>2.1</strong>-3 March 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!