<strong>Resource</strong>/haul time categoryDry tonsrecoverable TruckloadsTBtu/yearrecoverableCumulativeTBtu/yearrecoverablePrice($/MMBtu)Pulpwood, 90-105 min. 234,913 15,830 3.79 27.99 5.16Pulpwood, 105-120 min. 126,116 8,498 2.04 30.03 5.37Longleaf restoration, 75-90 min. 23,188 1,750 0.35 30.38 5.41Longleaf restoration, 90-105 min. 28,733 2,169 0.43 30.81 5.77Longleaf restoration, 105-120 min. 27,653 2,087 0.41 31.22 6.1242