<strong>Resource</strong>/haul time categoryDry tonsrecoverable TruckloadsTBtu/yearrecoverableCumulativeTBtu/yearrecoverablePrice($/MMBtu)Pulpwood, 75-90 min. 408,036 27,496 6.59 29.85 4.03Pulpwood, 90-105 min. 427,414 28,801 6.90 36.75 4.19Pulpwood, 105-120 min. 378,360 25,496 6.11 42.86 4.3459