10.07.2015 Views

Assessment of the Bill Emerson Memorial Bridge - FTP Directory ...

Assessment of the Bill Emerson Memorial Bridge - FTP Directory ...

Assessment of the Bill Emerson Memorial Bridge - FTP Directory ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.6. RemarksA detailed 3-D FE model is established for <strong>the</strong> <strong>Bill</strong> <strong>Emerson</strong> <strong>Memorial</strong> Cable-stayed<strong>Bridge</strong>s. The model has explicitly simulated all primary members <strong>of</strong> <strong>the</strong> complex structure.It will be refined and validated with field measured data in Section 5. Following is a briefsummary <strong>of</strong> main observations and comments on <strong>the</strong> model:1. In order to model <strong>the</strong> actual length and configuration <strong>of</strong> each cable as specified in <strong>the</strong>as-built drawings, one rigid link element is introduced in <strong>the</strong> FE model at each end <strong>of</strong> <strong>the</strong>cable. Long cables are more flexible than short cables. They all significantly influence <strong>the</strong>stiffness <strong>of</strong> <strong>the</strong> bridge system.2. The sagging <strong>of</strong> cables should be taken into account in <strong>the</strong> modeling <strong>of</strong> <strong>the</strong> cable-stayedbridge because it usually plays an important role in <strong>the</strong> dynamic response <strong>of</strong> <strong>the</strong> large-scalestructure.3 Boundary conditions in actual situations are usually complex; at <strong>the</strong> same time, <strong>the</strong>yhave significant effects on <strong>the</strong> dynamic behavior <strong>of</strong> <strong>the</strong> bridge. As such, extra attentionmust be paid to <strong>the</strong> modeling process <strong>of</strong> bearings at each pier both in <strong>the</strong> main span and in<strong>the</strong> approach part <strong>of</strong> <strong>the</strong> bridge.51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!