(ii)(iii)(iv)(v)(vi)(vii)(viii)(ix)(x)(xi)(xii)(xiii)Guard rail clearance : End to be buried in ballast with woodenblock.Cleaning of water way.Spacing of sleepers in approaches of important bridges (60 cm.Upto 100m on either Side.Inspection of bridge : Bridge register (P – 1103.4) Annexure-11/8.Painting/oiling & greasing : Date of painting on girder bridges,flood gauge to be paintedTrolley refuges.Bridge Tableau.Foundation plaque - Painting on piers and abutmentName Board on important bridgesH.F.L. and Danger level markingGauge and Cross levelProvision of dog bolts : arrow marking5.2 Bridge condition statement should be in following formatCondition of substructureCondition ofwing wallCondition ofsuper structureCondition ofBearing