11.07.2015 Views

Safety Organization/North Central Railway - eLocoS

Safety Organization/North Central Railway - eLocoS

Safety Organization/North Central Railway - eLocoS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(ii)(iii)(iv)Availability of spares (disc. Spark plug) and tools.Availability of cutogen and DA and 0 2 cylinders.Working to be checked by physical trial.4.3 GENERATOR(i)(ii)(iii)(iv)Whether in working order (actual trial to be done by starting it).Availability of petrol/diesel.Condition of brushes, andAvailability of spares.4.4 LIGHTING EQUIPMENT(I)(II)Check availability of lamps, reflectors, towards lights stands,cable, switch board.Trial to be done to check working.4.5 AVAILABILITY OF DRINKING WATER AND EATABLES(i)(ii)(iii)Check availability of water, date on which water was filled ormineral water.Check availability of milk, biscuits, coffee, tea leaf and theirexpiry dates.Availability of proper plates, cups and saucer.4.6 CHECK AVAILABILITY AND FUNCTIONING OTHER ITEMS(i)(ii)(iii)Check availability and functioning of jacks, digging equipment,tools, petromax, fire extinguisher, stove, kettle etc. to scale.Check availability of Accident Manual G&SR.Check availability of Red and green banners, detonators, torch,cell, transition coupling, tent etc.5.0 COACHING DEPOT5.1 PIT EXAMINATION AND CLEANLINESS(i) Adequacy of pit examination time for various rakes(ii) Availability of berthing slots(iii) Infrastructure availability and adequacies, of the following;a) Approach roadb) Cleanlinessc) Pathways for material movement.d) Lightinge) Pit Light for night examinationf) Welding connectionsg) Availability of compressor and

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!