11.07.2015 Views

Safety Organization/North Central Railway - eLocoS

Safety Organization/North Central Railway - eLocoS

Safety Organization/North Central Railway - eLocoS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(x) Installation is dust free(xi) All indications/alarms for various equipments are functional2.9 EI(i)(ii)(iii)(iv)Schedule maintenance is doneProper voltages for CPU, I/O cards and Misc equipment are available.Earthing and Surge protection system is effectiveStandby systems are working and seamless changeover in case of hotstandby is working. In case of warm standby, system changeover iseffective and being done regularly.(v) Communication with other EI/Panel/LCP is working. Media forcommunication wherever provided in redundant mode are in properworking conditions.(vi)There is no loose wires2.10 INTERLOCKED LC GATES(i)(ii)(iii)(iv)Gate opening and closing is smooth and trouble freeBoom locking is effective.All indications and Buzzers on control Panel are working.Audio visual warning for Road users where provided is functional.2.11 CABLE TESTING(i)(ii)(iii)(iv)(v)(vi)(vii)(viii)(ix)Cable Testing as per maintenance schedule.System of monitoring cable testing as per schedule.Availability of left over spares in existing cables.Age & insulation value left.Need for replacement of defective cable & quantity.Tail cables of all electrical gears are tested as per schedule.Critical points are provided with dedicated spare cable fully terminatedat either end for instant switching.Minimum 2 nos. of 12 core cable are available as spares from end to endon either side up to home signals.Line wise cables are laid and cable core conductor allotted with sparecables for each direction.2.12 SIGNAL FAILURE(i)(ii)(iii)(iv)Incidences of a particular gear failing repeatedlyRepeated causes.Broad analysis and input needed for improvement.Maintenance and inspection of signaling and telecom equipment isbeing done as per periodicity defined in maintenance schedule.2.13 DOCUMENTS(i)(ii)(iii)Prints of approved tracing of completion circuit of the last alterations areavailable.Modifications, if any done, it as per approved circuit & approveddiagrams for that are available.All documents as per list are available.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!