Safety Organization/North Central Railway - eLocoS
Safety Organization/North Central Railway - eLocoS
Safety Organization/North Central Railway - eLocoS
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2.1.2.5 UNDER CARRIAGE(i)(ii)Ensure working of ADC and MR drain cocks.Check for any leakage of air from valves and brake pipes.2.2 ELECTRICAL2.2.1 ENGINE IN SHUT-DOWN CONDITION2.2.1.1 DRIVER’s CAB:(i) Check cleanliness and condition of finger tips of CK1 and CK2Contractors.(ii) Visually inspect the condition of Panels.2.2.1.2 GENERATOR ROOM(i) Check Oil level in Hydraulic Governor if provided.2.2.1.3 ENGINE ROOM(i) Check for connection and layout of tacho generator wiring.2.2.1.4 EXPRESSOR ROOM(i)Check fuel pump carbon brush and condition of commutatorfor D.C. motors.2.2.1.5 RADIATOR ROOM(i) Check for wiring of RCC for proper clamping (Radiator clutchcoil).2.2.1.6 UNDER CARRIAGE(i) Check for layout of axle generator wiring and its clamping.(ii) Ensure that the cables are not rubbing with body.(iii) Ensure that the TM covers are intact and properly secured.2.2.2 ENGINE IN RUNNING CONDITION2.2.2.1 ENGINE CAB(i) Check for operation of ECC and other circuit breakers like FPCircuit breakers, Cr. Case Exhauster Motor circuit breakers.(ii) Check for correct operation of BKT. Reverser, Power contractors.(iii) Check for air leakages from pneumatic pipelines to reverser RXTand power contractor magnet valves.