11.07.2015 Views

Safety Organization/North Central Railway - eLocoS

Safety Organization/North Central Railway - eLocoS

Safety Organization/North Central Railway - eLocoS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(Availability of powerful lights for rolling in examination on eitherside on all platforms)(iii) System/adequacy of trouble-shooting of passing through trainsand monitoring of the same.(iv) Does TXR record correct levels of Air pressure on loco and SLR?Does he conduct checks for passenger Alarm Device ? Do thefitters have proper tools, lights, etc.? Are Ac coaches precooled?(v) Pad locking of terminating trains.(vi) Drainage/cleanliness of platform line.a) Clean Train Station activities and the performance levels,execution of CTS contract as per scope of work.b) Adequacy of fire fighting and other safetyequipments/plants.(vii) Performance of OBHS.5.5 MATERIALS(i)(ii)(iii)(iv)(v)(vi)Housekeeping.Compliance of stores imprests schedule.Important item out of stock / in short supply. Check consumptionof all consumables per annum. Is it adequate to cover thecleaning requirements throughout the years.Non moving items/correctness of imprests sanction.Scrap return.Proper storing of rubber item.5.6 FINANCE(i)(ii)High value item analysis.Review on acceptance of workshop debit.5.7 ESTABLISHMENT(i)(ii)(iii)(iv)VacanciesStaff grievancesHOD/Sick casesCausality/absentees. Are attendance registers properly kept andchecked in time? Action taken on frequent and OR longabsentees.5.8 TRAINING NEEDS(i)(ii)Facilities for training and adequacy thereofOverdue refresher courses, orientation courses and specialcourses and monitoring thereof.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!