11.07.2015 Views

draft - DOE Oak Ridge Operations - U.S. Department of Energy

draft - DOE Oak Ridge Operations - U.S. Department of Energy

draft - DOE Oak Ridge Operations - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.4 IM ObjectivesOne to effective IM Management is the clear articulation and wide acceptance <strong>of</strong> IMobjectives and goals. The most recent ORO IM Plan contained the goals and objectivesoutlined below. These were defined based on interviews with users throughout ORO.This is valuable information that will be validated and modified as necessary over thenext two months as the final version <strong>of</strong> this Plan is developed.DRAFTObjectives for Goal 1 - Accessibility1-1 A highly responsive ORO-wide information infrastructure will be established thatwill allow people to locate and collect the information they need quickly andeasily, have assurance that the information is accurate, and be able to quicklycommunicate answers and information to others, both internally and externally.1-2 Shared information resources will be available at the desktop with the Web asthe primary delivery mechanism.1-3 All ORO organizations will have a common document management and workflowcapability. [Also supports goal 11 - Corporate Approach.]1-4 Data files will be exchanged via e-mail attachments, shared server directories, orthrough network access with an ability to convert files to the user’s preferredformat.1-5 Availability <strong>of</strong> electronic information resources will be maximized to supportORO’s daily business.Objectives for Goal 2 - Connectivity2-1 ORO will have state-<strong>of</strong>-the-art, high-speed network connectivity both internallyand externally.2-2 ORO staff will have the capability to access all <strong>of</strong> their desktop functionality fromany geographic location.2-3 ORO staff will have the capability to form virtual (not bounded by geographiclocation) work groups.Objectives for Goal 3 - Corporate Approach3-1 ORO IM-related projects will be in compliance with <strong>DOE</strong>’s corporate IMguidance.3-2 Information requirements will be met using a shared corporate technologyarchitecture.3-3 ORO users will identify all data needed to perform their jobs to allow integration<strong>of</strong> data across ORO.3-4 Applications will be integrated across ORO.Objectives for Goal 4 - Ownership and Stewardship4-1 Information owners/stewards will be clearly identified and have responsibility forthe accuracy, timeliness, and sharability <strong>of</strong> their information resources.<strong>Oak</strong> <strong>Ridge</strong> <strong>Operations</strong>Information Management Plan10/1/99 4-3 Revision 0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!