draft - DOE Oak Ridge Operations - U.S. Department of Energy
draft - DOE Oak Ridge Operations - U.S. Department of Energy
draft - DOE Oak Ridge Operations - U.S. Department of Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Estimated Cost: $100K for contractor support (with expertise in operating/analyzingcorporate support centers) to assist <strong>Oak</strong>land in gathering information, recommendingsolutions, etc.10. TRAININGPurpose/Description: To establish and maintain an IT staff (both federal andcontractor) that is highly trained in the IT technologies, concepts, processes, etc. that arerequired by the SC sites. Through a collaborative training plan/approach, it is expectedthat significant cost savings can be achieved and beneficial “cross-fertilizing” <strong>of</strong> ideas,etc. among the staff will be realized.DRAFTStrategy/Approach: Once SC has a documented information architecture (in <strong>draft</strong>form), an outside training provider will assess and document the type and level <strong>of</strong> ITtraining needed across SC the planned IA. It is expected that the effort will begin bydocumenting (1) the training/skill set <strong>of</strong> all staff members (federal and contractor), (2) thetechnologies/capabilities currently requiring support, and (3) the technologies/capabilitiesexpected to be needed over the next 1-2 years. Then a gap analysis will be conductedto identify training needs, both individually and SC-wide. Once SC’s collective IT trainingneeds are identified, an SC-wide training plan will be prepared where courses/programscan be arranged for folks from all SC sites to participate in.Major Objective(s): An SC IT Training Plan by June 30, 2000, assuming sufficientprogress is made on the information architecture project.Lead Responsibility: OAK will take the lead on this project; however, all assistance incollecting baseline information will be required from all sites.Estimated Cost: $5K (although possibly $0) for a contractor to assess our trainingneeds and propose an approach. The cost could be higher (e.g., $50K) if we direct thecontractor to collect the baseline data.11. CYBER SECURITYPurpose/Description: To ensure information sharing and collaborative assistanceamong all SC sites regarding <strong>DOE</strong> cyber security requirements. Increasingrequirements are expected, and collaboration among the sites is expected to bringefficiencies.Strategy/Approach: SC HQ will be the focal point for ensuring that information isshared in a timely manner regarding cyber security. SC HQ will prepare an SC HQCyber Security Plan that can be used as a model by all sites. SC HQ will conductperiodic televideo meetings to share information and reduce duplicative efforts.<strong>Oak</strong> <strong>Ridge</strong> <strong>Operations</strong>Information Management Plan8/5/97 C-7Revision 0