7.1.5 Command StructureThe command structure will clearly outline both the on-shore and offshore management structures.Duties, responsibilities and authorities of all management personnel will be defined for both normaloperations and emergency situations. This will include lines of reporting and information flow, andlines of authority, and it will extend to both <strong>Husky</strong> Oil and contractor personnel. The OIM is the personin charge of the floating production facility and is responsible for coordinating all activities in the field.7.1.6 Contingency Planning<strong>Husky</strong> Oil will implement contingency procedures to serve as the guide for <strong>Husky</strong> Oil’s response toaddress possible emergency situations. The plans will outline the necessary personnel, equipment andlogistical support and procedures for responding to an emergency incident in a safe, prompt andcoordinated manner. Contents of the contingency plan are outlined in Table 7.1-1.Table 7.1-1White Rose Project Contingency Plan ContentSectionDescriptionIntroduction C Purpose and scope of planC Geographic coverageC Definition of emergencies coveredAction Plan C Conditions leading to emergenciesC Stages of alert and responseC Roles and responsibilitiesC Notification proceduresC Specific response activitiesEmergency Telephone List C Emergency services groupsC Company personnelC Contractors and suppliersC Government contactsArea Considerations C Location mapsC Facility and vessel diagramsC Sensitive areas near the emergency sceneEmergency Support C Medical servicesC Logistics support resourcesC Media guidelinesC Family supportC Communication systemsEmergency Preparedness C Plan maintenanceC Personnel trainingC ExercisesExternal Assistance C Mutual Aid arrangementsC Canadian Coast Guard assistanceC Well relief resourcesC C-NOPB Emergency Response PlanWhite Rose DA Project Summary • January 2001 Page 105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!