- Page 1 and 2: WHITE ROSE OILFIELDDEVELOPMENT APPL
- Page 3: TABLE OF CONTENTSPage No.1 INTRODUC
- Page 6 and 7: 7.1.5 Command Structure............
- Page 8 and 9: Figure 1.1-1White Rose LocationWhit
- Page 10 and 11: There will be three to four drill c
- Page 12 and 13: 1.2.1 Exploration HistoryThe first
- Page 14 and 15: Figure 1.2-2Depletion Schedule for
- Page 16 and 17: Figure 1.2-3United States Import Re
- Page 20 and 21: Figure 1.2-6Gas Infrastructure Inve
- Page 22 and 23: Figure 1.2-7Model for Gas Developme
- Page 24 and 25: These remaining five options (steel
- Page 26 and 27: Figure 1.3-2Relative Technical Risk
- Page 28 and 29: In addition, the steel FPSO will:
- Page 30 and 31: This system was evaluated as fourth
- Page 32 and 33: Figure 1.4-1Project Development Sch
- Page 34 and 35: 2.1 Regulatory RequirementsThe star
- Page 36 and 37: • project summary booklet, which
- Page 38 and 39: The first series of open houses fea
- Page 40 and 41: 2.6 Media BriefingsHusky Oil repres
- Page 42 and 43: 3 CANADA-NEWFOUNDLAND BENEFITS PLAN
- Page 44 and 45: 3.1.2 Canada-Newfoundland Benefit C
- Page 46 and 47: The subsea contract package will co
- Page 48 and 49: 3.1.3.6 Monitoring and ReportingHus
- Page 50 and 51: • The operations/production phase
- Page 52 and 53: • Husky Oil’s preferred develop
- Page 54 and 55: 4.1.2 White Rose Structural Geology
- Page 56 and 57: 4.2.1.3 West Avalon PoolOnly one we
- Page 58 and 59: Reducing oil handling capacities ha
- Page 60 and 61: 4.2.2.7 Reservoir ManagementReservo
- Page 62 and 63: Side scan sonar images of the White
- Page 64 and 65: Generators will be sized to meet th
- Page 66 and 67: 4.5.3 Marine Support VesselsHusky O
- Page 68 and 69:
The offshore organization will cons
- Page 70 and 71:
Husky Oil promotes safe operations
- Page 72 and 73:
Table 4.8-3Capital and Operating Co
- Page 74 and 75:
5 ENVIRONMENTAL IMPACT STATEMENTThe
- Page 76 and 77:
The principal origins of the iceber
- Page 78 and 79:
white hake and winter flounder. The
- Page 80 and 81:
Produced water, although treated pr
- Page 82 and 83:
opportunity for interaction with bi
- Page 84 and 85:
The effects of project development,
- Page 86 and 87:
Additional mitigation measures for
- Page 88 and 89:
In summary, after mitigation measur
- Page 90 and 91:
6 SOCIO-ECONOMIC IMPACT STATEMENTTh
- Page 92 and 93:
6.1.2.1 EducationIn recent years, t
- Page 94 and 95:
6.1.3.1 HousingThe number of dwelli
- Page 96 and 97:
Figure 6.1-1NAFO Divisions on the G
- Page 98:
During the development phase of the
- Page 101 and 102:
6.2.3 Community Physical Infrastruc
- Page 103 and 104:
damage or foul gear. Any damage to
- Page 105 and 106:
have medical programs for their ope
- Page 107 and 108:
7 SAFETY PLAN AND CONCEPT SAFETY AN
- Page 109 and 110:
Hazard prevention, detection and mi
- Page 111 and 112:
7.1.5 Command StructureThe command
- Page 113 and 114:
7.2.1 Major Hazard IdentificationTh
- Page 115 and 116:
8 REFERENCESJWEL (Jacques Whitford
- Page 117 and 118:
Adams Pearson Associates Limited. 1
- Page 119 and 120:
Hycal Energy Research Laboratories
- Page 121:
Schlumberger. 2000. Husky Oil et al