11.07.2015 Views

white rose oilfield development application - Husky Energy

white rose oilfield development application - Husky Energy

white rose oilfield development application - Husky Energy

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

In addition, the steel FPSO will:• provide opportunity for continuous employment and a growing industrial base for the province;• provide an opportunity, on a competitive basis, for Atlantic Canada and specifically Newfoundlandfacilities and workers to continue working in the province;• increase opportunities for facilities in the province providing expertise in engineering, subsea andtopside fabrication, drilling and supply services on a competitive global basis;• establish and consolidate a proven and leading exportable technology in the province for future<strong>development</strong>s off Canada’s east coast and abroad; and• enable expertise and industry within the province to keep pace with the current needs and trends inoffshore oil and gas <strong>development</strong> around the world.1.3.2 Alternative SystemsThe physical characteristics of the four alternative systems evaluated are briefly described in the followingsubsections. Only the steel semi-submersible with a detached floating storage unit is considered technicallyand economically feasible.1.3.2.1 Concrete Floating, Production, Storage and Offloading FacilityThis concept consists of a concrete barge outfitted for production, storage and offloading in a similarfashion to a steel FPSO. Due to displacement considerations, its plan area is necessarily larger than theequivalent steel FPSO. It has the ability to disconnect, if required, due to extreme conditions oricebergs.The concrete FPSO option was considered inferior to the steel FPSO option on the basis of feasibility.There are no existing units in the world and the construction scale is so large it would create expensivedemands on construction facilities.A concrete FPSO is marginally more flexible than a steel FPSO because the vessel size has to be large tosupport its own self-weight, and this size provides additional deck space.With respect to deliverability, the concrete FPSO was considered inferior to the steel FPSO optionbecause of the likelihood of limited construction facility competition for the concrete hull and the lack ofindustry experience on the required scale.This system was evaluated as second preference on project cost and third for time to First Oil (Figure1.3-1).White Rose DA Project Summary • January 2001 Page 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!