12.07.2015 Views

DB Schenker Terms and Conditions of Transport

DB Schenker Terms and Conditions of Transport

DB Schenker Terms and Conditions of Transport

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Where the dangerous goods are loaded in a container <strong>and</strong>transport is followed by sea transport, a signed packingcertificate/stowage certificate must be prepared by theperson responsible for the load for enclosure with theother documents. Each item must have the prescribedmarking <strong>and</strong> labelling.1.4.7 Wines <strong>and</strong> spirits – Contact your <strong>DB</strong> <strong>Schenker</strong> <strong>of</strong>fice.1.4.8 Weapons – Contact your <strong>DB</strong> <strong>Schenker</strong> <strong>of</strong>fice.1.4.9 Goods <strong>and</strong> storage insuranceGoods insurance is not included in the basic undertakingbut can be taken out through <strong>DB</strong> <strong>Schenker</strong>, see underOptions. With the amendment <strong>of</strong> §27 C.3 in the General<strong>Conditions</strong>, storage insurance is only taken out followinginstructions from the customer.2. Surcharges <strong>and</strong> option costsFor supplementary/optional services in addition to thebasic undertaking, there will be surcharges, which aredecided in agreement with the consignor or/freight payer(also applies to consignee freight).For example:Options• Special equipment (e.g. forklift truck <strong>and</strong> crane truck)for loading <strong>and</strong> unloading• Special securing devices• Return <strong>of</strong> a receipt• Special equipment on a vehicle, rear lift in certain countries• Obtaining a permit <strong>and</strong> special measures according tothe permit terms <strong>and</strong> conditions in conjunction withtransport where dispensation is assumed from applicabletraffic regulations• Special measures in conjunction with the transport <strong>of</strong>objects higher than 2.2 m (international 2.0 m), longerthan 6 m or wider than 2.4 m• Measures resulting from the requirement that transporttakes place without reloading or using a certain means<strong>of</strong> transport• The cost <strong>of</strong> returning the Ti part <strong>of</strong> the waybill or othertransport document together with the invoice.• Special monitoring/supervision <strong>of</strong> vehicles carryingcertain dangerous goods according to the stipulations inADR, ADR-S• <strong>Transport</strong> support – production <strong>of</strong> transport supportdocumentation• Specified unloading timeSurcharges• Amended charge as a result <strong>of</strong> an incorrectly statedpayment instruction• Cost <strong>of</strong> correcting incorrect <strong>and</strong>/or incomplete transportinstructions• Cost <strong>of</strong> incorrect transport instructions• Charge for parcel consignments <strong>and</strong> individual parcelsthat exceed the stated weight <strong>and</strong> volume stipulations• Special internal cleaning <strong>of</strong> vehicles• Dead weight as a result <strong>of</strong> a cancelled assignment notbeing cancelled within a reasonable period <strong>of</strong> time priorto the agreed loading time• Reloading as a result <strong>of</strong> local traffic regulations orlimited access3. Freight calculation <strong>and</strong> terms <strong>and</strong>conditions <strong>of</strong> payment3.1 Freight calculationFreight is calculated according to the price list agreedbetween the customer <strong>and</strong> <strong>DB</strong> <strong>Schenker</strong>, or according toa price list adopted by <strong>DB</strong> <strong>Schenker</strong>. In addition to thepart <strong>of</strong> the freight stated in the price list, certain freightsupplements <strong>and</strong> surcharges are payable as well as chargesfor supplementary services <strong>and</strong> options over <strong>and</strong> above thebasic undertaking.Certain transport movements require certain measures,equipment or aids over <strong>and</strong> above the basic undertaking.For such transport movements, <strong>and</strong> for other services over<strong>and</strong> above the basic undertaking, surcharges are debited orthe freight is calculated differently from what is as statedin the price lists.3.2 <strong>Terms</strong> <strong>and</strong> conditions <strong>of</strong> paymentIn the case <strong>of</strong> domestic goods, the freight should be paidin full, either by the consignor or by the consignee.In the case <strong>of</strong> international goods, the freight costs,charges etc. are divided between the seller <strong>and</strong> the purchaseraccording to Combiterms 2011 – L<strong>and</strong> transport,unless otherwise agreed.The client should always inform the carrier <strong>of</strong> theCombiterms applicable.The consignor is liable for the payment <strong>of</strong> freight forgoods that can spoil quickly or the value <strong>of</strong> which cannotbe guaranteed to cover the freight cost. The consignor isliable for payment <strong>of</strong> all costs related to a consignmentthat is not collected by the consignee.If <strong>DB</strong> <strong>Schenker</strong> invoices the consignee <strong>and</strong> the consigneerefuses to pay, stating that a different agreement wasreached between the consignee <strong>and</strong> the consignor, theconsignor is liable for payment <strong>of</strong> the freight. The sameshall apply if the consignee, after the end <strong>of</strong> the paymentperiod <strong>and</strong> after a reminder has been sent, has not paidthe freight.Freight <strong>and</strong> other charges are stated excluding VAT.<strong>DB</strong> <strong>Schenker</strong>’s general terms <strong>of</strong> payment are ten (10) daysnet from the date <strong>of</strong> the invoice unless payment in cash isdem<strong>and</strong>ed by <strong>DB</strong> <strong>Schenker</strong>.The minimum charge per consignment is SEK 160, excludingoptions <strong>and</strong> surcharges. For <strong>DB</strong> SCHENKERcoldsped,the minimum charge is SEK 180 per consignment. Theminimum charge does not apply to <strong>DB</strong> SCHENKERparcel.An extended period <strong>of</strong> credit can be granted in exceptionalcases <strong>and</strong> is regulated through an interim agreement, whereupon which a credit charge is payable on the invoiceamount for each extra day <strong>of</strong> credit over <strong>and</strong> above thegeneral ten (10) days.Freight credit can be obtained after a separate review<strong>and</strong> on presentation <strong>of</strong> customary security, such as adeposit, an on account payment or a bank guarantee.An invoicing charge is debited according to the<strong>DB</strong> <strong>Schenker</strong> rules applicable at the time the invoiceis issued.If there is a delay in payment, the <strong>DB</strong> <strong>Schenker</strong> penaltyinterest applicable at the time the invoice was issued isdebited <strong>and</strong> is charged from the due date stated on theinvoice. The interest on overdue payments is currently1.8% per month. A statutory reminder fee is debited ifa written reminder is issued.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!