MIL-HDBK-502 - Barringer and Associates, Inc.
MIL-HDBK-502 - Barringer and Associates, Inc.
MIL-HDBK-502 - Barringer and Associates, Inc.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>MIL</strong>-<strong>HDBK</strong>-<strong>502</strong>: ACQUISITIONALOGISTICSUser provides feedback to DoD activities.End result?DoD activities analyze:Analysis results in:Alterations−Improved readiness.FEEDBACK LOOP6.4 SUPPORTABILITY ISSUESengineeringlogistics supporttrainingmanningcostimproved parts <strong>and</strong> supportbetter training <strong>and</strong> manningengineering change proposalsFigure 6-4. Metrics Feedback Loop6.4.1 Supportability RequirementsSupportability issues—constraints, down time, turn around times, life-cyclecosts, stockage levels, <strong>and</strong> the like—become specific logistics objectives.• Operations <strong>and</strong> maintenance manpower <strong>and</strong> man-hourconstraints• Personnel skill level constraints• Operating <strong>and</strong> support costs constraints• Target percentages of system failures (downing events)correctable at each maintenance level• Mean down time in the operational environment• Turn around time in the operational environment• St<strong>and</strong>ardization <strong>and</strong> interoperability requirements• Life-cycle costs• Stockage levels of materiel• Repair level6-18