MIL-HDBK-502 - Barringer and Associates, Inc.
MIL-HDBK-502 - Barringer and Associates, Inc.
MIL-HDBK-502 - Barringer and Associates, Inc.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>MIL</strong>-<strong>HDBK</strong>-<strong>502</strong>: ACQUISITIONALOGISTICS6.4.2 Supportability Design FactorsDirect maintenance:The following figures (6-5 <strong>and</strong> 6-6) provide good examples of expressingsupportability requirements in measurable terms <strong>and</strong> building supportabilityrequirements into the design.F-18 MAINTENANCE REQUIREMENTSMan-hours/flight hour 11.02Operational availability 80%Turn around time (max. 3 men)15 min.Mean time to repair1 hr. 46 min.Fault isolate time90% in 5 min.Fault isolate time100% in 10 min.Engine change21 min. (4 men)Radar remove <strong>and</strong> replace21 min. (2 men)Figure 6-5. Maintenance RequirementsWhat happens when the logistician isn’t involved in the design process?Logistic problems get built into the design. For example, when the F-4 wasdesigned, the radio was placed to the left of the rear seat bucket under theair data computer. This placement made good sense from the design pointof view because it kept a heavy object forward. The radio was relativelyreliable, <strong>and</strong> routine maintenance could be performed in ten minutes or so.The problem was that in order to get to the radio the ejection seat had tobe dearmed <strong>and</strong> the seat bucket <strong>and</strong> computer removed—<strong>and</strong> then theprocess had to be completed in reverse after the radio maintenance hadbeen completed. The ten minute job had become a four or five hour job.Even worse was the possibility of maintenance-induced failure of thecomputer when it was reinstalled, which would render the aircraft nonflyable.6-19