12.07.2015 Views

MIL-HDBK-502 - Barringer and Associates, Inc.

MIL-HDBK-502 - Barringer and Associates, Inc.

MIL-HDBK-502 - Barringer and Associates, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MIL</strong>-<strong>HDBK</strong>-<strong>502</strong>: ACQUISITIONALOGISTICS7.3.9 Post Production SupportPurpose <strong>and</strong> ContentThese summaries are used to analyze life cycle support requirements of asystem or equipment before production lines are closed to ensuresupportability over the system or equipment’s remaining life. Thesesummaries identify items within the system that will present potentialproblems due to inadequate sources of supply, or modification aftershutdown of production lines. They also may identify alternative solutionsfor anticipated support difficulties during the remaining life of the system orequipment.General topics that may be addressed in this summary include, but are notlimited to, manufacturing, repair centers, data modifications, supplymanagement, configuration management, <strong>and</strong> other related areas. Figure7-9 presents a sample summary layout.Post Production Support SummaryREF.Section I - Potential Problem ItemsCAGE NUMBER NSN PCCN PLISN NAME SMR97384 59822-40310-20 P1BGK0 D265 analyzer, frequency PAHHD97384 59822-47021 5998-01-415- P1BGK0 A714 circuit card PAHHD5833 assembly97384 59822-90086-121 6130-01-415- P1BGK0 B867 power supply PAHDD715697384 63603-40001-20 P1BGK0 B436 controller PAHDD97384 63603-90023 P1BGK0 A251 disk drive unit PAHZZITEMSection II - Alternative SolutionsCAGE REFERENCE NUMBER ALTERNATIVES COSTFigure 7-9. Sample Post Production Support Summary7-16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!