13.07.2015 Views

Link to thesis. - Concept - NTNU

Link to thesis. - Concept - NTNU

Link to thesis. - Concept - NTNU

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

32Stage 2: Data structuring and refinement, in which data were recorded in<strong>to</strong> a database according<strong>to</strong> a pre-defined structure. For each project, there is one unique record in the database and aseparate file with hard-copies of its documents. Data also are s<strong>to</strong>red and displayed in aspreadsheet.Stage 3: Data comparison and analysisData for each project were normalized <strong>to</strong> the same price level as was the actual cost (based oncalculation by the NPRA and stated in the Annual report and in the Final Project Report). Thecalculation is verified by the sec<strong>to</strong>r index compiled by Statistics Norway.Stage 4 comprises the presentation and display of data, of which Figure 6 is an example. Themain output of the study of differences in estimates is shown in Figure 6, in which the differencebetween the estimate proposed by the project organization prior <strong>to</strong> external review and theestimate recommended by the external consultant is calculated in percent. The estimates areassumed <strong>to</strong> be comparable in the sense that cost data have been brought <strong>to</strong> the same price leveland fac<strong>to</strong>rs including price escalation, project changes, etc have been accounted for.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!