13.07.2015 Views

Link to thesis. - Concept - NTNU

Link to thesis. - Concept - NTNU

Link to thesis. - Concept - NTNU

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

34agreements on the fractional distribution of actual costs between financing parties. Therefore, itis assumed that an investigation that involves comparison of early and later estimates is justified.This rests on the assumption illustrated in Figure 7 (Samset (2008)), in which illustrates a typicalcost development in a project and underlines the importance of getting things right in the earlystages. Cost overruns or cost savings defined by the difference between final budget and actualcost may often be negligible if early estimates are included in the analysis.As it should have beenCost overunCost savingsStrategicunderestimationAs it wasFront-endimplementationInitialestimateFinalbudgetFinalcostFigure 7 Cost development in projectsThe development of cost from the early stages of definition <strong>to</strong> decision <strong>to</strong> build, in the 14projects in which estimates were obtainable, is shown in Figure 8. The cost figures are normalized<strong>to</strong> the 2007 level <strong>to</strong> facilitate comparison. It is shown that the <strong>to</strong>tal costs for the 14 projectsincreased by NOK 5.2 billion from the earliest estimates <strong>to</strong> the estimates proposed by the agencyat the detailed planning level. All projects save one contributed <strong>to</strong> the cost increase.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!