13.07.2015 Views

Untitled - Town of Windham

Untitled - Town of Windham

Untitled - Town of Windham

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CAPITAL IMPROVEMENTS PROGRAMreimbursement through the Salt Ed Outreach Program. This is a federally sponsored program to helpreduce chloride use on roads. Funds are in place at the state level.CIP Recommendation: The sub-committee assigned a Classification I (Urgent) with funding <strong>of</strong>$300,000 in FY2013. However, the acquisition is contingent upon the <strong>Town</strong> receiving the 80% grant.Grant monies are shown in the plan under CIP Annual Contributions.Project Title: Front End LoaderProposed by: Jack McCartney, Highway AgentEstimated Cost: $135,000 in Year 2014Proposal: To purchase a front end loader for year round uses. This will be a replacement <strong>of</strong> thecurrent loader.CIP Recommendation: The sub-committee assigned a Classification III (Desirable) with funding in FY2015.Project Title: Wood ChipperProposed by: Jack McCartney, Highway AgentEstimated Cost: $50,000 in Year 2015Proposal: To purchase a wood chipper to do tree and brush work for normal maintenance and to dealwith storm damage.CIP Recommendation: The sub-committee assigned a Classification IV (Deferrable) with funding inFY 2019.Project Title: One Ton Dump/Pickup Truck ReplacementProposed by: Jack McCartney, Highway AgentEstimated Cost: $100,000 in Year 2016Proposal: For scheduled replacements with the existing trucks going to other departments if needed orwill be auctioned <strong>of</strong>f.CIP Recommendation: The sub-committee assigned a Classification IV (Deferrable) with funding inFY 2019.Project Title: Small Track ExcavatorProposed by: Jack McCartney, Highway AgentEstimated Cost: $100,000 in Year 2017Proposal: To purchase a small track excavator for multiple uses including ongoing roadside duties(shoulder repairs and shimming), treatment <strong>of</strong> swale and detention pond maintenance, culvert work, andbasin work or repairs.CIP Recommendation: The sub-committee assigned a Classification IV (Deferrable) with funding inFY 2020.Project Title: Five Ton Truck ReplacementProposed by: Jack McCartney, Highway AgentEstimated Cost: $200,000 in Year 2018Proposal: For a scheduled replacement <strong>of</strong> an existing truck. The cost is for a complete replacement.This amount may be reduced if the attached equipment, on the current vehicle, is in condition.CIP Recommendation: The sub-committee assigned a Classification IV (Deferrable) with funding inFY 2020.Project Title: Five Ton Truck ReplacementProposed by: Jack McCartney, Highway AgentEstimated Cost: $200,000 in Year 20202012 ANNUAL REPORTS 56 TOWN OF WINDHAM, NH

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!